Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T07CM00914
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
04/11/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOTES: 1. EXISTING SERVICE NOT GROUNDED. REINSTALL GROUNDING ELECTRODE SYSTEM PER 250 NEC ENCLOSURES 2. NEUTRAL IS BONDED AT SERVICE DISCONNECT, ISOLATE GROUNDS & NEUTRALS AT BREAKER PANEL 3. CHECK OUT CONDUCTORS IN GUTTER, SOME ARE DETERIORATED -- INSULATION RUBBING INTO CONDUIT. 4. INSTALL PERMANENT ADDRESS LABEL ON SERVICE ALSO, TAGS OR LABELS AS TO EQUIP. FEEDING - MODULAR, ETC. 5. CHECK OUT GROUNDING INTEGRITY AT REMOTE PANEL BY MODULAR, BREAKERS IN PANEL HAVE WATER DAMAGE, RUST, CHECK OUT & CLEAN ALL TERMINATIONS. |