Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2008 | ENGINEERING - FINAL | Approved | ||
| 12/11/2007 | ENGINEERING - FINAL | Correction Required | 1) PROVIDE "ONEWAY " SIGNAGE" AS SHOWN ON PLAN, NOTE #29. 2) PROVIDE 6" WATER HARVESTING AREA WITH DRAINAGE TO WALL OPENING, NOTE #32. 3) COMPLETE LANDSCAPE WORK. 4) INSTALL WHEEL STOPS AS SHOWN ON PLAN - ADD PARKING SPACE TO NORTH SIDE OF BLDG. 5) PROVIDE TWO - CLASS II BICYCLE PARKING SPACES. 6) PROVIDE HC SIGN FOR PARKING SPACE. 7) INSTALL WEEP HOLES IN SCREEN WALL TO ALLOW FOR DRAINAGE, NOTE #38. 8) PROVIDE APPROVAL FROM ARCHETECT FOR CHANGES MADE TO THE 6' SCREEN WALL TO A 2' SCREEN WALL SEE NTE #28. |