Permit: T07BU02606

Parcel: 10511061R


Addresses:

4500 N ORACLE RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T07BU02606

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
04/08/2010 STORMWATER FOLLOW-UP INSP Approved SITE IS 100% STABILIZEDNO STORM WATER CONCERNS
04/06/2010 STORMWATER FOLLOW-UP INSP Continued NO STORM WATER CONCERNS AT THIS TIME, AWAITING SITE COMPLETION AND FINAL GRADING AT REI
02/19/2010 STORMWATER FOLLOW-UP INSP Correction Required 1) SWEEP UP ALL TRACKED SOIL OFF OF PARKING AREA.
2) CLEAN OUT ALL CATCH BASINS ON SITE.
3) SIBMIT NOTICE OF TERMINATION TO ADEQ PRIOR TO STORM WATER FINAL.
01/06/2010 STORMWATER FOLLOW-UP INSP Continued WORK CONTINUING ON REI BLDG AND SITE WORK AROUND IT
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
12/30/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
NO CHANGES, SITE WORK AND BLDG UNDER CONSTRUCTION
10/13/2009 STORMWATER FOLLOW-UP INSP Continued Site work still underway, stockpile not yet moved, need controls.
10/05/2009 STORMWATER FOLLOW-UP INSP Correction Required 1) CONTRACTOR MUST CONTINUE TO PROTECT ALL CATCH BASINS, WALL OPENINGS AND STORM SEWER UNTIL SITE IS PAVED.
2) CONTRACTOR MUST REMOVE OR LOWER STOCKPILED MATERIAL OR BENCH THE PILE TO REDUCE THE HEIGHT AND/OR AQUIRE A STOCKPILE PERMIT.

COMPLY BY 2 WEEKS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION
09/25/2009 STORMWATER FOLLOW-UP INSP Continued CONTRACTOR MUST PROTECT ALL CATCH BASINS, STORM SEWER INLETS AND WALL OPENINGS FROM SOIL UNTIL CONSTRUCTION IS COMPLETED.
CONTRACTOR MUST CONTINUE TO SWEEP UP TRACKED MATERIAL OFF PARKING LOT.
CONTRACTOR MUST REMOVE STICKPILED MATERIAL OR BENCH THE PILE TO REDUCE THE HEIGHT AND/OR ACQUIRE A STOCKPILE PERMIT.
06/11/2009 STORMWATER FOLLOW-UP INSP Continued SITE IS BEING WORKED AGAIN, NO SIGNIFICANT STORM WATER CONCERNS, MAY NEED TO ADD CONTROLS AROUND INSTALLED CATCH BASINS.
03/05/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/10/2009 STORMWATER FOLLOW-UP INSP Continued NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/27/2009 STORMWATER FOLLOW-UP INSP Correction Required 1) CLEAN OUT ALL CATCH BASINS IN AND AROUND THE CONSTRUCTION SITE - MOST ARE FILLED WITH SEDIMENT AND DEBRI.
2) PROTECT ALL STORM WATER CATCH BASINS AT OR BELOW GRADE W/FILTER FABRIC AND OR SEDIMENT CONTROLS PER YOUR SWPPP.
3) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT PER YOUR PLAN AND USED IT.
4) CONTINUE TO PERFORM PERIODIC STORM WATER SELF INSPECTIONS PER YOR SWPPP AND DOCUMENT THEM (KEEP RECORDS FOR 3-YEARS).
5) CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF PARKING AREA.
6) RE-ESTABLISH SEDIMENT CONTROLS AROUND STOCKPILED MATERIAL SW CORNER.

COMPLY BY 10 WORKING DAYS.
NON-COMPLIANCE WILL RESULT A NOTICE OF VIOLATION.
01/26/2009 STORMWATER FOLLOW-UP INSP Correction Required NEED TO PROTECT ALL EXISTING AND INSTALLED CATCH BASINS FROM SEDIMENT. INSTALL A DESIGNATED CONCRETE WASH-OUT ON SITE, SWEEP UP TRACKED SOIL OFF OF PARKING AREA, NEED TO ADD SEDIMENT CONTROLS AROUND STOCKPILED MATERIAL.
01/20/2009 STORMWATER FOLLOW-UP INSP Correction Required SITE IN NON-COMPLIANCE WITH APPROVED SWPPP, AND AZDES PERMIT. WILL CONTACT NEW SUPERINTENDENT ASAP TO GIVE A TIME FRAME FOR COMPLIANCE.
10/01/2008 STORMWATER FOLLOW-UP INSP Correction Required NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.

CONTINUE TO PERFORM STORM WATER SELF INSPECTIONS PER PLAN.
PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE.
CONTINUE TO SWEEP UP TRACKED SOIL AND MATERIALS OFF OF PARKING LOT AS NEEDED.
08/14/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/28/2008 STORMWATER FOLLOW-UP INSP Correction Required CONTINUE TO REPAIR/REPLACE SEDIMENT CONTROLS AND DOCUMENT INSPECTIONS UNTIL THE SITE IS STABILIZED.
CONTINUE TO SWEEP UP TRACKED MATERIAL OUTSIDE OF GRADING LIMIT.
07/15/2008 STORMWATER FOLLOW-UP INSP Correction Required 1) ADD SUPPLEMENTAL SEDIMENT CONTROLS AT ALL STORM WATER CATCH BASINS ON SITE.
2) CLEAN OUT EXCESS SOIL AND DEBRIS FROM STORM SEWER CATCH BASINS.
3) RE-ESTABLISH CONTROLS ALONG THE SOUTH PERIMETER AND AT DRAINAGE OUTLET.

10 DAY COMPLIANCE
06/03/2008 STORMWATER FOLLOW-UP INSP Correction Required MET W/ SUPERINTENDENT ABOUT ADDITITONAL GRADING PERMIT (T08BU00513) FOR A NEW PARKING STRUCTURE ALONG THE EAST SIDE OF THE SITE. ALL STORM WATER INSPECTIONS WILL BE HANDLED UNDER THE ORIGINAL SWPPP FOR THE SITE.
05/15/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/23/2008 STORMWATER FOLLOW-UP INSP Correction Required 1) RE-ESTABLISH SEDIMENT CONTROLS IN FRONT OF DRAINAGE OUTLET ALONG SOUTH PERIMETER.
2) RE-ESTABLISH SEDIMENT CONTROLS AROUND ALL CATCH BASINS IN WORK AREA AS NEEDED. MAY NEED TO CLEAN OUT CATCH BASINS AT END OF PROJECT FOR FINAL GRADING APPROVAL.
3) CONTINUE TO SWEEP UP TRACKED MATERIAL ROUTINELY.
4) CONTINUE TO DOCUMENT SW SELF INSPECTIONS
04/01/2008 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS PAVED ON PERIMETER.
STORM WATER CONTROLS IN PLACE ALONG LOW (SOUTH) SIDE OF SITE, AND AT ALL CATCH BASINS AND STORM WATER OUTLETS.

1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER PLAN.
2) ENSURE ALL STORM WATER CONTROLS ARE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT.
3) SWEEP UP ANY TRACKING OF SOIL OFF SITE.
02/28/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME