Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) TWO EXISTING CATCH BASINS ON SITE - TWO LAYERS OF SILT SOCK W/SANDBAGS AROUND EACH - CONTINUE TO MAINTAIN AND REPLACE IF NECESSARY. 2) SILT SOCK INSTALLED ALONG PERIMETER FENCE AT SOUTH SIDE OF SITE - ENSURE SOCK OVERLAPS AND IS SECURED IN PLACE, MAINTAIN AS NECESSARY. 3) GRAVEL BAGS INSTALLED AT SURFACE DRAINAGE OUTLET ALONG SOUTH SIDE. 4) SWEEP UP ANY TRACKED SOIL ROUTINELY - ENSURE SEDIMENT STAYS ON SITE. MAY NEED STABILIZED CONSTRUCTION ENTRANCE/EXIT. 5) INSTALL A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE. |