Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T07BU01526
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/2009 | GRADING - INTERMEDIATE | Approved | ||
09/30/2009 | GRADING - INTERMEDIATE | Partial Approval | Work continuing on the park and landscaping. | |
09/16/2009 | GRADING - INTERMEDIATE | Partial Approval | Met with Parks dept., contractor, Eng., and Arch. for project to discuss grading of the Park adjacent to Fire central. Landscape plans and Eng. plans were different in regards to grading around the gazibo and some water harvest areas. Direction was given to install rip rap and grouted rip rap in some areas, also to install rock filled drains around some CB's and to raise one Cb to reduce slope angle. Eng to revise plan to reflect changes to match what will be installed. Eng. to check with Loren M. to determine is changes can be shown on an as-built. | |
08/18/2009 | GRADING - INTERMEDIATE | Continued | Spoke to Carl today he said he may be ready for a temp Cof O by friday, I told him that the site must be safe and went over what that means. they have alot of work to finish before that will happen. Gave Jim V a heads up. | |
08/12/2009 | GRADING - INTERMEDIATE | Continued | Forming and pouring sidewalk along frontage and interior to site | |
08/06/2009 | GRADING - INTERMEDIATE | Continued | Grading for parking lot and entrace still on going. | |
08/03/2009 | GRADING - INTERMEDIATE | Partial Approval | grading for sidewalk at south property line, grading for parking behind app bay, contractor broke 8" drain line from roof, will repair prior to backfilling. | |
07/30/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to backfill 8"HDPE pipe from CB to roof drain at west side of Bldg. Contractor poured collars on 2 CB. Grading for rear approach to app. bays. | |
07/29/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to cover 8" and 12" HDPE pipe at rear and side entrance. | |
07/22/2009 | GRADING - INTERMEDIATE | Partial Approval | 36" RCP at south porpoerty backfilled. | |
07/21/2009 | GRADING - INTERMEDIATE | Partial Approval | poured conc. curbing in front of app bay, backfilling 36" rcp pipe. | |
07/20/2009 | GRADING - INTERMEDIATE | Partial Approval | No backfill of 36" RCP today, downspouts behind app bay not finished. | |
07/16/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to backfill 36"RCP at south property, OK to backfill connections to downspouts south of app bay. | |
07/15/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to backfill 8"HDPE drain pipe at rear of app. bay, Backfill of 36"rcp will begin tomorrow | |
07/13/2009 | GRADING - INTERMEDIATE | Partial Approval | Cb at 36" RCP poured today, downspout connects at rear of app bay underconstruction. | |
07/10/2009 | GRADING - INTERMEDIATE | Partial Approval | All 36" RCP installed, last CB formed and approved to pour. | |
07/09/2009 | GRADING - INTERMEDIATE | Partial Approval | 36" RCP installed at south PL. forming Cb at angle point for future connection. | |
07/08/2009 | GRADING - INTERMEDIATE | Partial Approval | installing 36" RCP, forming CB and inlet structure along south property line. 12" amd 8" HDPE pipe installed south of App. bay. | |
07/07/2009 | GRADING - INTERMEDIATE | Partial Approval | forming up connection between 36"RCP and 36"HDPE ok to pour install pipe at rear of app. bay place waddle at inlet structure from street rear of property. |
|
07/06/2009 | GRADING - INTERMEDIATE | Partial Approval | installing 36" RCP at rear of property OK to pour CB at rear of App. bay. install waddel at inlet structure from street rear of property. Remove dirt ramp daily from curb line. |
|
07/02/2009 | GRADING - INTERMEDIATE | Partial Approval | 2-36" RCP tie in to box culvert and 60ft run to 36" HDPE | |
07/01/2009 | GRADING - INTERMEDIATE | Continued | began installation of 36" RCP at south property line. | |
06/22/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to backfill 15" SD, and 8" SD @ CB rear of Ap bay | |
02/23/2009 | GRADING - INTERMEDIATE | Partial Approval | Finish shading storm pipe prior to backfill sht. C1.2 | |
02/23/2009 | GRADING - INTERMEDIATE | Partial Approval | ||
02/03/2009 | GRADING - INTERMEDIATE | Partial Approval | OK to cover 12" storm pipe from CB @ line 5 to 36", and 36" storm pipe along NE corner of lot. | |
12/03/2008 | GRADING - INTERMEDIATE | Partial Approval | OK to cover 15" storm pipe item #26, 27 on sht. C1.2 | |
07/03/2008 | GRADING - INTERMEDIATE | Partial Approval | 18" RCP pipe #12 on C1.2 OK to cover | |
06/27/2008 | GRADING - INTERMEDIATE | Partial Approval | OK to backfill pipe and catch basins 11-4- and 11-42. | |
06/20/2008 | GRADING - INTERMEDIATE | Partial Approval | Approved installation of 18 inch pipe for key note 9 and 10. | |
06/04/2008 | GRADING - INTERMEDIATE | Partial Approval | Contractor asked for an inspection of 36" and 12" storm pipe along south edge of project, pipe was installed in straightline and grade and bedded per std's. |