Permit: T07BU01526

Parcel: 11713069E

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Permit Number - T07BU01526

Inspection Description - GRADING - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
11/09/2009 GRADING - INTERMEDIATE Approved
09/30/2009 GRADING - INTERMEDIATE Partial Approval Work continuing on the park and landscaping.
09/16/2009 GRADING - INTERMEDIATE Partial Approval Met with Parks dept., contractor, Eng., and Arch. for project to discuss grading of the Park adjacent to Fire central. Landscape plans and Eng. plans were different in regards to grading around the gazibo and some water harvest areas. Direction was given to install rip rap and grouted rip rap in some areas, also to install rock filled drains around some CB's and to raise one Cb to reduce slope angle. Eng to revise plan to reflect changes to match what will be installed. Eng. to check with Loren M. to determine is changes can be shown on an as-built.
08/18/2009 GRADING - INTERMEDIATE Continued Spoke to Carl today he said he may be ready for a temp Cof O by friday, I told him that the site must be safe and went over what that means. they have alot of work to finish before that will happen. Gave Jim V a heads up.
08/12/2009 GRADING - INTERMEDIATE Continued Forming and pouring sidewalk along frontage and interior to site
08/06/2009 GRADING - INTERMEDIATE Continued Grading for parking lot and entrace still on going.
08/03/2009 GRADING - INTERMEDIATE Partial Approval grading for sidewalk at south property line, grading for parking behind app bay, contractor broke 8" drain line from roof, will repair prior to backfilling.
07/30/2009 GRADING - INTERMEDIATE Partial Approval OK to backfill 8"HDPE pipe from CB to roof drain at west side of Bldg. Contractor poured collars on 2 CB. Grading for rear approach to app. bays.
07/29/2009 GRADING - INTERMEDIATE Partial Approval OK to cover 8" and 12" HDPE pipe at rear and side entrance.
07/22/2009 GRADING - INTERMEDIATE Partial Approval 36" RCP at south porpoerty backfilled.
07/21/2009 GRADING - INTERMEDIATE Partial Approval poured conc. curbing in front of app bay, backfilling 36" rcp pipe.
07/20/2009 GRADING - INTERMEDIATE Partial Approval No backfill of 36" RCP today, downspouts behind app bay not finished.
07/16/2009 GRADING - INTERMEDIATE Partial Approval OK to backfill 36"RCP at south property, OK to backfill connections to downspouts south of app bay.
07/15/2009 GRADING - INTERMEDIATE Partial Approval OK to backfill 8"HDPE drain pipe at rear of app. bay, Backfill of 36"rcp will begin tomorrow
07/13/2009 GRADING - INTERMEDIATE Partial Approval Cb at 36" RCP poured today, downspout connects at rear of app bay underconstruction.
07/10/2009 GRADING - INTERMEDIATE Partial Approval All 36" RCP installed, last CB formed and approved to pour.
07/09/2009 GRADING - INTERMEDIATE Partial Approval 36" RCP installed at south PL. forming Cb at angle point for future connection.
07/08/2009 GRADING - INTERMEDIATE Partial Approval installing 36" RCP, forming CB and inlet structure along south property line. 12" amd 8" HDPE pipe installed south of App. bay.
07/07/2009 GRADING - INTERMEDIATE Partial Approval forming up connection between 36"RCP and 36"HDPE ok to pour
install pipe at rear of app. bay
place waddle at inlet structure from street rear of property.
07/06/2009 GRADING - INTERMEDIATE Partial Approval installing 36" RCP at rear of property
OK to pour CB at rear of App. bay.
install waddel at inlet structure from street rear of property. Remove dirt ramp daily from curb line.
07/02/2009 GRADING - INTERMEDIATE Partial Approval 2-36" RCP tie in to box culvert and 60ft run to 36" HDPE
07/01/2009 GRADING - INTERMEDIATE Continued began installation of 36" RCP at south property line.
06/22/2009 GRADING - INTERMEDIATE Partial Approval OK to backfill 15" SD, and 8" SD @ CB rear of Ap bay
02/23/2009 GRADING - INTERMEDIATE Partial Approval Finish shading storm pipe prior to backfill sht. C1.2
02/23/2009 GRADING - INTERMEDIATE Partial Approval
02/03/2009 GRADING - INTERMEDIATE Partial Approval OK to cover 12" storm pipe from CB @ line 5 to 36", and 36" storm pipe along NE corner of lot.
12/03/2008 GRADING - INTERMEDIATE Partial Approval OK to cover 15" storm pipe item #26, 27 on sht. C1.2
07/03/2008 GRADING - INTERMEDIATE Partial Approval 18" RCP pipe #12 on C1.2 OK to cover
06/27/2008 GRADING - INTERMEDIATE Partial Approval OK to backfill pipe and catch basins 11-4- and 11-42.
06/20/2008 GRADING - INTERMEDIATE Partial Approval Approved installation of 18 inch pipe for key note 9 and 10.
06/04/2008 GRADING - INTERMEDIATE Partial Approval Contractor asked for an inspection of 36" and 12" storm pipe along south edge of project, pipe was installed in straightline and grade and bedded per std's.