Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2008 | GRADING - FINAL | Approved | STAMPED PLAN REVISION 11/7/8 BY PAUL MACHADO NEW "AS BUILT" -SHOWS NO BLDG 2 (PHASE LINE) -SHOWS BASIN RAMP REMOVAL (E BASIN) -SHOWS TRUNCATED DOMES AND WHEEL STOPS IN THE OFFICE-ALLOWING FOR PEDESTRIAN REFUGE AREA ON N SIDE OF SHOP AREA |
|
| 10/30/2008 | GRADING - FINAL | Correction Required | -PHASING LINES NEEDED FOR BLDG 2 -PLZ CLARIFY KEYNOTE #17 FOR WEEPHOLE REQUIREMENT -BOLLARDS NOT INSTALLED PER KEYNOTE #11 AT ACCESS RAMP (WEST SIDE) -BOLLARDS AND ACCESS RAMP NOT INSTALLED IN BASIN PER KEYNOTE #11 (EAST SIDE) -NOT ALL DOWNSPOUTS ARE SCUPPERED UNDER SIDEWALK (DUE TO ELEVATION CHANGE/FLUSH ASPHALT) EAST OF OFFICE AT BAY DOORS -SIDEWALK/ASPHALT NOT BUILT AT PLAN ELEVATIONS (FLUSH-NOT 4/10THS DIFFERENCE) |