Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2008 | STORMWATER FOLLOW-UP INSP | Approved | CLOSE OUT PERMIT | |
| 06/23/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTROLS NEED MAINTENANCE | |
| 03/04/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CONCRETE WASH OUT SIGN AT EITHER BERMED LOCATION THAT CONCRETE IS BEING WASHED OUT | |
| 01/17/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | PERIMETER WALL INSTALLED CONTROLS IN PLACE AROUND CATCH BASIN |
|
| 12/10/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 10/01/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | WALKED SITE CLIFF NOT ON SITE SE CORNER OF PROJECT HAS GATE FOR H2O DEPT ACCESS 10/2 TALKED TO CLIFF THE ENGINEER HAS HAD DISCUSSION WITH COT WATER REGARDING ACCESS |