Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 10/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Repair straw bales. 2- Sweep Street. 3- Keep wash out cleaned up. 4- Sweep west side parking area. 5- Stake down wattle. Spoke to Brain site super in regards to. |
|
| 07/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Replace damaged SWPPP controls. 2- Clean track out from street. 3- Add SWPPP controls to eastside of project. 4- Provide wash out area and ensure sub's use. Spoke to site super in regards to. |