Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 01/03/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Bob on site to go over SWPPP changes. Contractor to beef up track out pads and remove controls from Southwest corner. | |
| 12/10/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to: 1- Sweep Commerce Ct. 2- Install construction entrance north side. 3- Install construction entrance west side or controls. Contractor has 3 days to address items. If items are not addressed I will issue a stop work order or a notice of violation. Spoke to Bob site super in regards to. |
|
| 10/05/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean up around port-a-potty. Contractor may need to anchor it down. Spoke to site super in regards to. | |
| 08/22/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Stormwater water controls in place. | |
| 07/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make repairs to eastside of project. Spoke to Bob site super in regards to. | |
| 06/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor install controls around perimeter of of site. Contractor continues to work outside grading limits. | |
| 06/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice, contractor has 5 days to address: 1- Contractor working outside grading limits. 2- Contractor needs to install additional SWPPP controls. 3- Approved SWPPP must be maintained on site and available for review. 4- Contractor will need to stabilize all areas disturded by construction at end of project. Spoke to site super, if items are not address in 5 days will issue Notice of Violation. |