Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | Met with the project super, Chris Bowen 784-3698. Held pre-con and discussed installation of stormwater controls. He will begin around 5/29. |