Inspection History Details
Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contactor continues to address punch list. | |
| 02/20/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Mike site super, in regards to hydro-seed mix, for stabilizing all areas disturbed by construction. Mike will need to contact Andy Conner about approved seed mix. | |
| 11/05/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No SWPPP concerns at this time. Building is 3" high. Spoke to Mike site super about it effecting the HC parking and HC ramps. | |
| 10/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No SWPPP concerns at this time. Contractor installed discharge pipes for basin. | |
| 09/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Post copy of NOI. 2- Extend wattle on south side and stake every 3 to 4 feet. Contractor gived copy of re-fee policy. |