Inspection History Details
Inspection Status: Approved
Inspection History: INITIAL CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2006 | INITIAL CODE VIOLATION | Approved | DAMAGE RPT - TOTAL LOSS ENTIRE STRUCTURE. VACANT HOME - TOTAL LOSS EXCEPT EXTERIOR WALLS. PERMITS REQUIRED. FW/UP IN 30 DAYS. |