Inspection History Details
Inspection Status: Approved
Inspection History: FOLLOW UP CODE VIOLATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2006 | FOLLOW UP CODE VIOLATION | Approved | STOPED BY SITE, WORK BEING DONE, WAS UNABLE TO FIND WHERE PERMIT HAS BEEN ISSUED. CHECKED PERMIT PLUS BY NEIL AND TALK TO OFFICE OF CONTRACTOR DOING WORK. GAVE COPY OF DAMAGE REPORT TO CONTRACTOR AND HE WILL GET PERMIT. CHECK WITH OFFICE OF SCHOOL AND THEY ARE WORKING THRU INSURANCE. AL REPAIRS BEING DONE THRU THE INSURANCE. WILL CHECK IN 10 DAYS. | |
| 04/22/2006 | FOLLOW UP CODE VIOLATION | Approved | DAMAGE REPORT ELECTRIC OK PLUMBING OK, NOTE: SPRINKLER WENT OFF AT DOMAR. MECHANICAL OK BUILDING-NO DAMAGE TO MAIN STRUCTURE BUT HAS DAMAGE TO SOME CEILING TILES, DRYWALL WHERE BLISDTERING FROM WATER. FLOORING HAS APPROX 2" OF WATER OVER CARPETING AND VCT. GLASS BROKEN AT TOP OF DORMER. DAMAGE DONE TO S BUILDING IN HALL. DAMAGE REPORT HANDED TO CONTRACTOR |