Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

COM: FIRE
Address:

Entered Date:

04/24/2006

Applicant:

SUNNYSIDE SCHOOL DISTRICT NO 12

Description:

EMERGENCY SCHOOL FIRE CALL

Completed Inspections

Case Status: COMPLIAN
Case Number: T06VL00553
Case Description: COM: FIRE
Total Completed Inspections - 2
End Date Description Inspector Results Comments
04/22/2006 INITIAL CODE VIOLATION RVIDAL Approved RECEIVED A CALL FROM COMMUNICATION THAT TFD HAD A SCHOOL FIRE AND NEEDED AN INSPECTION. I WAS AT ANOTHER FIRE AND WAS ABLE TO RESPOND DUE TO OTHER FIRE INSPECTOR WAS STILL DOING INVESTIGATION. ARRIVED TO SITE AND CHECKED AREAS INVOLVED IN FIRE. SOMEONE HAD GONE TO ROOF AND TOSSED A COCKTAIL BOMB AT DORMER IN ATRIUM AREA BELOW THEN TOSSED FLARES INTO BUILDING. TWO SPRINKLERS WENT OFF IN THE AREA OF FIRE AND DID DAMAGE TO DRYWALL AND SOME ACOUSTIC TILE IN DROP CEILINGS. THE DRYWALL HAD BUBBLES WHERE WET WHERE THE PAINT AND TEXTURE WERE LIFTING. THE GLASS ON TOP ON DORMER WAS BROKEN ON ROOF. TFD WAS REQUESTING CHECK ON STRUCTURAL MEMBERS AND THERE WERE NONE. T.E.P WAS ASKING IF POWER WAS LEFT ON DOE TO ALL ELECTRICAL WIRING IS IN CONDUIT AND NO DAMAGE WAS DONE BEYOND THE DRYWALL. DUE TO SPRINKLERS TURNING ON, THERE WAS A LARGE AMOUNT OF WATER ON FLOOR. FIRE FIGHTERS WERE TRYING TO REMOVE THE TOILET IN ONE OF THE BATHROOMS TO DRAIN WATER INTO PIPE ON FLOOR. MET WITH SCHOOL PERSONNEL AND THEY HAD MAINTENANCE ON WAY TO REPAIR WINDOW AND START THE CLEAN UP. DUE TO PROPERTY BEING IN SCHOOL DISTRICT AND HAS SECUREMENT BEING ADDRESSED, ASKED CHIEF TO BE DISMISSED FROM SITE. I TOLD HIM POWER WAS BEING LEFT ON , WINDOW WAS BEING SECURED WHERE BROKEN BY SCHOOL PERSONNEL. ASKED ON STRUCTURAL DAMAGE AND SAID ALL DAMAGE WAS TO DRYWALL AND WINDOW FRAME. CHIEF SAID THAT IS ALL HE NEEDED. LEFT SITE TO OTHER FIRE WILL CHECK IN 10 DAYS.
06/04/2006 FOLLOW UP CODE VIOLATION RVIDAL Approved STOPED BY SITE, WORK BEING DONE, WAS UNABLE TO FIND WHERE PERMIT HAS BEEN ISSUED. CHECKED PERMIT PLUS BY NEIL AND TALK TO OFFICE OF CONTRACTOR DOING WORK. GAVE COPY OF DAMAGE REPORT TO CONTRACTOR AND HE WILL GET PERMIT. CHECK WITH OFFICE OF SCHOOL AND THEY ARE WORKING THRU INSURANCE. AL REPAIRS BEING DONE THRU THE INSURANCE. WILL CHECK IN 10 DAYS.

Completed Activity Special Conditions

Case Description - COM: FIRE
Case Number - T06VL00553
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
Date Name
06/14/2006 VIOLATION CLOSED.

Documents

File Name Document Type  
None DOCUMENTS VIEW
None CONSTRPLANS VIEW