Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/27/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE MINIMUM 10 PSI TEST ON ENTIRE GAS SYSTEM AT TIME OF REINSPECTION. EXPOSE PIPING AT RISER LOCATION, PRIME THEN 10 MIL TAPE FITTINGS, PIPE & TOOL MARKS T0 6" ABOVE FINISH GRADE. 2. PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES. 3. PROVIDE MINIMUM 100 SQ. INCHES 10"X10" UPPER & LOWER COMBUSTION AIR FOR WATER HEATER. 4. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT & TERMINATE AT 90 DEG. DOWN ON EXTERIOR 6"-24" FROM FINISH GRADE. 5. VENT FROM FURNACE SHALL BE DOUBLE WALL THRU ROOF, CONTINUE DOUBLE WALL TO APPROVED DOUBLE WALL VENT CAP & TERMINATE MINIMUM 2' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE. |