Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 300 NORTH GAS DEMAND IS 300,000 BTU TOTAL LENGTH APPROX. 60' 1 1/4" PIPING IS REQUIRED TO FIRST FURNACE. 1" REQUIRED TO SUPPLY SECOND FURNACE AND WH TEE SHALL BE FULL SIZE PROVIDE PLAN FOR GAS PIPING AND INSTALLATION OF NEW FURNACE. INSTALLATION OF NEW FURNACE REQUIRES MECHANICAL PERMIT. HAVE MECHANICAL INSPECTION PRIOR TO GAS INSPECTION. PETITION OF APPEAL REQUIRED IF T&P CANNOT TERMINATE OUTSIDE. SEDIMENT TRAPS REQUIRED. NO TAPE AT VENT CONNECTOR TO VENT CONNECTION SUPPORT PIPING AT WH SEAL WALL PENETRATION. |