Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2006 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1. VENT FROM WATER HEATER & FURNACE TO BE MADE UP CORRECTLY AND HAVE 3-GALV SCREWS AT EACH JOINT OF FLUE VENT PIPE. 2. PROVIDE RIDGID PIPE THRU FURNACE APPLIANCE HOUSING. 3. SECURE GAS PIPING IN FURNACE/WATER HEATER CLOSET 4. PROVIDE BONDING OF BUILDING GAS PIPING. MAKE CORRECTIONS AND PROVIDE RETEST OF GAS SYSTEM THIS IS NOT A RECONNECT. |