Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T06PL00467

Parcel: 133300720

Inspection Status: Partial Approval

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
03/22/2006 PLUMBING - GAS PRESSURE TEST Partial Approval 15 PSI TEST OVERHEAD TO FURNACE & WATER HEATER ONLY OK
03/20/2006 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
PIPING ON ROOF TO HAVE PERMANENT SUPPORT AND BE SECURED.
PROVIDE ROOF FLASHINGS AT PENETRATIONS THRU ROOF FOR PIPING. VENTS FROM WATER HEATER TO BE 3' ABOVE AND FURNACE VENT TO BE 2' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE WITH DOUBLE WALL VENT PIPING & APPROVED VENT CAP.
WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL BE GRAVITY TO DAYLIGHT OR PROVIDE CITY SIGNED PETITION OF APPEAL ON SITE WITH CORRECT INSTALLATION FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF.