Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/31/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLAN ON SITE SOME CORRECTIONS MADE 1. PROVIDE RIDGID T&P DRAIN FOR WATER HEATER. 2. PROVIDE CORRECT TAILPIECE AT KITCHEN SINK PROVIDE CORRECT BACKFLOW PROTECTION FOR LANDSCAPING H2O. 3. PROVIDE MINIMUM PRESSURE VACUUM BREAKER FOR LANDSCAPING WATER SUPPLY. WITH CERTIFICATION. |
|
| 06/29/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 1:40 PM NO ACCESS |
|
| 05/23/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE PLAN THAT IS ACTUAL FOOTPRINT OF BUILDING WITH PLUMBING FIXTURE LOCATIONS. 2. PROVIDE VACUUM BREAKERS AT HOSE BIBS. 3. PROVIDE MINIMUM 6" CRITICAL LEVEL AT FLUSH VALVES FOR STOOL & URINAL. 4. WATER HEATER TEMPERATURE & PRESSURE RELIEF SHALL GRAVITY DRAIN TO DAYLIGHT. 5. WATER HEATER SHALL REQUIRE EXPANSION TANK. |
|
| 05/12/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO ACCESS 10:33 WE CANNOT MAKE APPOINTMENTS HAVE AN ADULT PRESENT. 7:00-3:30 TO PROVIDE ACCESS AT RE-INSPECTION. |