Inspection History Details
Inspection Status: Correction Required
Inspection History: INSP - AST/UST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/21/2006 | INSP - AST/UST | Correction Required | Inspected ASTs on premises 3 x 120 gallon- New Oil 1 x 240 gallon- New Oil 1 x 1000 gallon- Used Oil Corrections required are: 1. combustible liquid placards on all tanks 2. emergency venting for the waste oil, 1-120 gal tank 3. secondary containment for 1-120 gal tank |