Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2008 | ENGINEERING - FINAL | Approved | AS-BUILT PLANS WERE RECEIVED AND APPROVED BY LAITH ALSHAMI | |
| 11/05/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO, SEE PREVIOUS NOTES | |
| 10/24/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TCO PENDING COMPLETED AS-BUILT AND FINAL GRADING APPROVAL | |
| 10/20/2008 | ENGINEERING - FINAL | Not ready for Inspection | SEE PREVIOUS NOTES ALSO NEED (2) SCUPPERS, (1) HANDRAIL, CORRECT PONDING WATER. |
|
| 10/16/2008 | ENGINEERING - FINAL | Not ready for Inspection | OK FOR TEMPORARY C OF O FOR FURNISHING AND STOCKING ONLY. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR GRADING PERMIT #T06BU02875 IS COMPLETED AND APPROVE. 2. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT, THE DRAINAGE AND THE R/D BASIN ARE CONSTRUCTED TO THE APPROVED PLANS AND FUNCTION AS DESIGNED. 3. COMPLETE ALL SITE WORK. 4. CALL IN FINAL GRADING INSPECTION 5. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |
|
| 10/02/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O FOR FURNISHING AND STOCKING ONLY. 1. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 FOR GRADING PERMIT #T06BU02875 IS COMPLETED AND APPROVE. 2. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED P.E. THAT CERTIFYS THAT THE PROJECT, THE DRAINAGE AND THE R/D BASIN ARE CONSTRUCTED TO THE APPROVED PLANS AND FUNCTION AS DESIGNED. 3. COMPLETE ALL SITE WORK. 4. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURING TO PREVENT NON-CONSTRUCTION TRAFFIC. 5. MAINTAIN SAFE INGRESS/EGRESS TO SPEEDWAY AND WILMOT. |
|
| 08/20/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMPORARY C OF O FOR SALES OFFICES ONLY. PERMANENT C OF O NOT TO BE GIVEN UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL GRADING INSPECTION IS COMPLETED AND APPROVED. 1. MAINTAIN PEDESTRIAN AND VEHICLE ACCESSABILITY FROM SPEEDWAY TO THE BUILDING. 2. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PUBLIC ACCESS. |
|
| 08/18/2008 | ENGINEERING - FINAL | Denied | NOT READY 1. PROVIDE SAFE VEHICLE PARKING AND ACCESS FROM SPEEDWAY TO BUILDING. 2. PROVIDE SAFE PEDESTRIAN ACCESS FROM SPEEDWAY TO BUILDING. 3. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 4. BARRICADE ALL AREAS WHERE ON-GOING CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PUBLIC ACCESS. |