| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2008 | MECHANICAL - FINAL | Approved | ||
| 10/23/2008 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/21/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1. PROVIDE SCREENS IN ALL EXHAUST T-TOPS 2. PACKAGE UNITS ON ROOF NOT FUSED CORRECTLY 3. PAINT ALL EXPOSED PVC VENTS ON ROOF 4. PROVIDE AIR BALANCE REPORT 5. ALL FIRE DAMPERS AND DUCT DETECTORS HAVE BEEN TESTED |
|
| 10/20/2008 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/16/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1. REPAIR ALL REFER LINE INSULATION ON ROOF 2. SEAMS ARE NOT STICKING TOGETHER 3. REPAIR DAMAGED T-TOPS 4. EXPOSE ALL MECHANICAL WORK IN ALL COMMON AREAS FOR INSPECTION |
|
| 10/15/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* OK FOR FINAL C BLDG. TESTED FIRE DAMPERS & DUCT SMOKE DETECTORS |
|
| 10/13/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* DAMPERS AT 1134/1234 NON-OP. - DO NOT USE AN A/C UNIT TO CONNECT BRACING FOR FIREPLACE FLUE |
|
| 10/08/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* OK FOR FINAL A BLDG. & LIVING AREAS & CORRIDORS IN B BLDG. |
|
| 10/07/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* TESTED INTERLOCK WITH KITCHEN EXHAUST & MAKE UP AIR |
|
| 10/06/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* EXTEND FIREPLACE FLUE ON ROOF. PROVIDE GREASE CUPS UNDER FANS. SECURE FIREPLACE FLUES ON ROOF AND REPLACE DAMAGED CAP. |
|
| 10/01/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* - FINISH ALL WORK ON ROOF BLDG. A - CANVAS COVERS, GREASE DUCT CONNECTIONS, PAINT ON GREASE DUCTS AND PVC. - LABEL DATA PLATES - NEED TO TEST ALL UNITS WITH FIRE ALARM SYSTEM, ETC. |
|
| 09/24/2008 | MECHANICAL - FINAL | Partial Approval | OK FOR FINAL BLDG. C 1ST & 2ND FLOORS |
|
| 09/23/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1. BLDG. B UNITS OK FOR FINAL 2. BLDG. B CORRIDORS NEED TO BE COMPLETED 3. ALL DUCT SMOKE DETECTORS MUST BE CONNECTED TO FIRE ALARM SYSTEM. |
|
| 09/22/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 3RD FLOOR BLDG. B UNITS OK FOR FINAL |
|
| 08/19/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* OK FOR FINAL UNITS 1101 AND 1123 ONLY |
|
| 08/18/2008 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* FAN COIL CIRCUIT BREAKERS NOT PROPER SIZE SMALL CONDENSOR CIRCUIT BREAKER NOT PROPER SIZE |
|
| 08/18/2008 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* |