| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/31/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - PROVIDE AN APPROVED DRAIN AND SEAL CONN. AT FLOOR AT ADA SHWRS - PROVIDE SHWR HOSE FOR HW TEST - COMPLETE PREVIOUSLY NOTED ITEMS AND FOUNTAIN/POOL PERMITS |
|
| 10/28/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* BLD. D - 2ND LEVEL WATER OK EMPLOYEE BREAK ROOM & RESTROOM AT LAUNDRY AREA OK |
|
| 10/24/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SEE NOTES FROM REGULAR INSPECTION DATED 10/24/08 1, 2, 6, 8, 10, 11, 12, 14 NEED COMPLETION OF VENT FOR LAUNDRY WATER HEATER, WITH DRIP PAN UNDER WATER HEATER. DRAINS IN EMPLOYEE RESTROOM AT LAUNDRY FLUSH TO FINISH FLOOR FLOOR CLEANOUTS TO BE FRANK PATTERN COVERS FOR TRAFFIC BLD. D FIXTURES OK IN ROOMS AFTER HRS. INSP. CHECK TOTAL $150.00 2 CHECKS @ $75.00 EA. (CK. #'s 111500, 111501) |
|
| 10/24/2008 | PLUMBING - FINAL | Not ready for Inspection | JAMES @ 235-0180 1. JANITOR SINK CHEMICAL ADDITION GETS WATER FROM WHERE? THIS MAY REQUIRE A SOURCE OF WATER BESIDES THE FAUCET AT THIS SINK. 2. INSULATE WATER HEATER & BOILERS 3. PROVIDE SUPPORT EXPANSION TANK AT WATER HEATER 4. PROVIDE GRATE FOR FLOOR SINK IN LAUNDRY 5. SUPPORT WATER HEATER CONDENSATE DRAIN PIPING 6. SUPPORT GAS PIPING AT VALVE TO DRYER IN NORTHEAST CORNER 7. COMPLETE EQUIPMENT INSTALLS IN LAUNDRY 8. INSTALL ACCESS PANEL IN EMPLOYEE ROOM RESTROOM 9. SECURE TEMPERING VALVE IN EMPLOYEE RESTROOM BY LAUNDRY 10. COMPLETE VENT PIPE IN SOFTENER ROOM 11. CPVC TO STEEL REQUIRES CPVC MALE I.P CONNECTION TO BRASS FEMALE I.P CONNECTION AT SOFTENER 12. SALT TANK REQUIRES APPROVED GRAVITY DRAIN TO RECEPTOR FOR OVERFLOW TANK DRAIN. 13. ALL ROOF DRAINS REQUIRE DEMOS 14. NEED ACCESS TO ROOMS WANTING TO OCCUPY 15. NEED TO SEE BLD. D JANITOR CLOSET 16. SECTION D ROOMS 1251, 1160, 1166 NEED INSPECTION 17. ALL HOSE BIBS REQUIRED INSTALL 18. TRASH ENCLOSURE INSPECTION 19. VERIFICATION OF HOT & COLD CONNECT AT ALL ROOMS. |
|
| 10/23/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 10/22/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* D BLD. 2ND LEVEL ALL ROOM FIXTURES EXCEPT #1251 OK 1. EXPOSE CLEANOUTS FOR SHAMPOO SINKS IN SALON |
|
| 10/20/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1ST LEVEL ROOMS BLD. D ALL OK EXCEPT 1160 & 1166 BLD. A 1. LAV FOR EMPLOYEES REQUIRES HOT TEMPERING 2. CHEMICAL ADDITIONS FOR MOP SINK REQUIRES A SEPARATE WATER SERVICE 3. CHEMICAL ADDITION TO DISHWASHER RINSE ADDITION MAY REQUIRE BACKFLOW ADDITION |
|
| 10/17/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 2ND LEVEL BLD. D ROOMS ONLY ALL EXCEPT 1251, 1254, 1255, 1256, 1257, 1261, 1274 RECEIVED CHLORINE & BACTERIA REPORT FOR POTABLE WATER |
|
| 10/16/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLUMBER NEEDS TO COMPLETE ALL WORK IN EACH BUILDING TO DO FINAL INSPECTIONS. WE HAVE PROVIDED LISTS IN THE PAST, COMPLETE THEM AND HAVE ALL WORK COMPLETED OR YOU WILL PAY REINSPECTION FEES. LAST WARNING. |
|
| 10/14/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PLUMBER NEEDS TO CORRECT GAS REGULATOR VENT PROVIDE SUPPORT FOR PVBS PROVIDE NON-FERROUS PIPING UPSTREAM OF ASSEMBLY PVB SHALL BE INSTALLED 12" ABOVE FLOOD LEVEL PROVIDE CERTS. AFTER MAKING CORRECTIONS SECURE HB VAC B |
|
| 10/07/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* ALL BEV. EQUIPT. MUST BE INSTALLED FOR FINAL INSP. (NOTE: ISOLATE ALL DFS AND BEV. EQUIPT. DURING DISINFECTION) NEED TO SEE TEMPERING CONTROLS AT BOILER FOR TEMPERING REQUIRED AT PUBLIC LAVATORY. EXPOSE ACCESS TO CPVC CONN. AT BOILER. EXPOSE CLEANOUTS COVERED OR MISSING PROVIDE AG AT DISPOSER HOSE. CORRECT DRIP AT 3 COMP SINK RM. 250 CLIP SINK |
|
| 10/03/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. 1ST FLOOR A PUBLIC TOILET RMS. OK 2. WALKED KITCHEN W/PLUMBER AND IDENTIFIED CORRECTIONS NEEDED. 3. NEED TO INSPECT BOILERS. 4. THEN REINSPECT FIXTURES ONCE HOT WATER SYSTEM IS ENERGIZED. NOTE: BOILERS ALSO REQUIRE STATE BOILER INSPECTOR CERT. |
|
| 10/02/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* C BUILD 1ST FLOOR PRIVATE RMS. OK NOTE: 2003 UPC REQUIRES DISINFECTION OF BUILDING WATER SUPPLY 609.9 |
|
| 10/01/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - LEVEL 2 BLD. C - PRIVATE RM. FIXTURES OK - MS NOT YET INSTALLED - PROVIDE ACCESS TO ALL CPVC THREADED CONNECTIONS AS REQUIRED BY UPC IS #20 AND PREVIOUSLY AGREED - A BUILD NOT READY. JAMES. |
|
| 09/29/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/26/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - 2ND LEVEL SEC. C WEST TO EAST PRIVATE ROOM FIXTURES OK - HOSE BIBS MISSING VAC BREAKER - CONSTRUCTION PERSONNEL IS USING WATER - PLEASE CORRECT - NOTE: STERILIZATION IS REQUIRED FOR POTABLE WATER |
|
| 09/24/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* SEC. B FINAL FIXTURE INSP. IN ROOMS OK WILL NEED TO VERIFY AIR GAP AT HANDHELD SHOWERS AND THE INSTALLATION OF ACCESS PANELS WHERE REQUIRED. |
|
| 09/23/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1. L1 SEC B FIXTURES OK EXCEPT FOR RMS. 1102, 1106 AND 1110 2. PROVIDE ADEQUATE ACCESS TO TRAP PRIMER VALVES 3. PLANS NEED TO BE IN AN AREA THAT IS NOT LOCKED DURING INSP. HOURS. |
|
| 09/19/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* LEVEL 3 FIXTURES OK LEVEL 2 BUILD. SEC B FIXTURES OK EXCEPT RMS. 1204 & 1223 |
|
| 09/15/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1317 LAVATORY NOT CORRECTED ALL OTHER RMS. 3RD FLOOR B FIXTURES OK I HAVE CIRCLED MANY UNCOMPLETED INSPECTION REQUESTS PLEASE READ AND PROVIDE THE OUTSTANDING REQUIRED PLAN REVISIONS PREVIOUSLY REQUESTED. FAILURE TO COMPLY WILL RESULT IN REINSPECTION FEES. |
|
| 09/12/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/11/2008 | PLUMBING - FINAL | Cancelled | PER ZEE | |
| 09/09/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/28/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1317 CORRECT LAV P-TRAP (INSTALLED BACKWARDS) 1318 & 1319 LEAKS AT KS 1313 LEAK AT LAV 1310 KS TRAP ARM TUB SPOUTS |
|
| 08/26/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/19/2008 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* FINAL FIXTURES RMS 1101 AND 1123 OK PROVIDE DOCUMENTATION FOR COMPLIANCE OF UPC SEC 609.9 FOR STERILIZATION OF BUILDING WATER SYSTEM |
|
| 08/18/2008 | PLUMBING - FINAL | Not ready for Inspection | UNIT #1124 CORRECT CONDENSATE DRAIN TO LAV UNIT #1101 REPAIR LEAK AT SOUTH LAV DRAINAGE 1. WILL REQUIRE AUTHORIZATION TO DISCHARGE FROM PCDEQ ON SEWER, AND BACTERIA REPORT FOR POTABLE WATER SUPPLY |
|
| 07/16/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO FINAL APPROVALS CAN BE GIVEN UNTIL ALL REQUIRED PLAN REVISIONS HAVE BEEN APPROVED BY THE CITY AND PROVIDED TO INSPECTOR FOR COMPARISON TO REDLINES PROVIDED BY CONTRACTOR. NEED ACCURATE REVISION FOR RWLS AT CORR. 246. STILL NEED REVS FOR: 1. WATER MAINS SEC B AND 2. WATER SCHEMATICS P6.1 3. CHANGES TO GAS SYSTEM REGULATOR LOCATIONS AND VENTING 4. FS AT SOFTENER 5. ACCESSIBLE SHOWER PIPING HAMMER ARRESTORS REQUIRED AT WBS SECURE DW's AND DW HOSES INSTALL CLIPS ON SINKS |