Permit: T06CM06423

Parcel: 13320129C


Addresses:

6300 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
09/17/2008 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
08/04/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SEC. B EMPLOYEE RM ROUGH SOIL W/TEST OK
05/06/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
GREASE INTERCEPTOR INSTALLED PER REDLINE ON P-1-1-3
TEST OK.

SEWER HAS NOT BEEN APPROVED. AUTHORIZATION FROM PC IS REQUIRED FOR CONNECTION TO SEWER.
03/12/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST FOR 4" FROM 6" BUILDING SEWER TO CAN WASH AREA PER PO.1.1 YELLOW PAGE OK

1. WILL NEED END OF LINE CLEANOUT & TRANSITION
TO APPROVED MATERIAL FOR SUN EXPOSURE.
3/4 WATER TO SAME OK
02/20/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SEC A GW OK TO COVER
REDLINE CHANGES
02/19/2008 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SANITARY PIPING BUILDING A - OK TO COVER
11/06/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
- OK FOR CONCRETE SEC. C BETWEEN COLS. 14-19
- SOIL PIPING SEC. C OK TO COVER AFTER REMOVING LARGE CHUNKS.
- BACKFILL SHALL BE DONE PER UPC SEC. 315.4 USE CLEANFILL HAND PLACED
11/05/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
TOM @ 602-725-0607

TRUNK LINE, CORRIDOR 2119 OK
COMPLETION OF PIPING AT SE CORNER OF CORR. 2121 OK
11/01/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
10/26/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
4" GW FROM EXTERIOR TO INITIAL P1.13 PLUMBERS MINI PLAN WATER TEST OK
WATER TEST UNITS # 1/2 1138 NORTH THRU 1134 & 1185 INITIALED ON P1.13
MAKE REPAIR 3" 45 DEG. AT UNIT 1185
10/25/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
UNIT #1179 WATER TEST OK
FROM UNIT #1180 EAST TO UNIT #1139 WATER TEST OK
10/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST FROM UNITS 1142 & 1179 WEST OK
EXCEPT UNIT 1177
10/23/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST COMPLETION OF BUILDING D UNDERGROUND OK
10/18/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST BUILDING D FROM UNIT 1163 WEST TO 6" JUNCTION FROM SOUTH AT UNIT 1159 OK
10/17/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/11/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
REPAIR SEC. B 8" COUPLINGS UNDER TEST
OK TO COVER
HCS SEC D, CONNECTION MADE OK
HAVE NOT YET RECEIVED AUTHORIZATION TO DISCHARGE
CONTRACTOR WAS TOLD NOT TO CONNECT
10/10/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SEC. B EAST SIDE OK. RETEST MAIN
SEC. D FROM SPLIT AT RM 1169 NORTH TO 1167
10/09/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
10/09/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WEST HALF OF BUILDING B RETEST ON
UNDERGROUND DWV OK
10/05/2007 PLUMBING - ROUGH, SOIL Cancelled
10/04/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
10/03/2007 PLUMBING - ROUGH, SOIL Cancelled
10/02/2007 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
SEC. B - LARGE QUANTITIES OF BRANCH PIPING AND COMPLETE BATHROOM GROUPS OF PIPING HAVE BEEN REMOVED AND REINSTALLED - UNCOVER THESE AREAS FOR REINSPECTION AND RETEST
10/01/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SEC. D SOUTH HALF TO ELEVATOR LOCATION OK
09/28/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
09/24/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
LAUNDRY DRAINS RM 2106
OK TO COVER
CORRECT TIE IN POINT
PROVIDE CO PER PLAN
09/21/2007 PLUMBING - ROUGH, SOIL Cancelled
09/18/2007 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
NEW PLUMBING CONTRACTOR IS BILL SISSON
LAUNDRY RM 2106
PLAN SHOWS 6" TO TD
SUPPORT & SHADE PIPING W/CLEAN FILL
ALL FIXTURES REQUIRE A VENT, INSTALL PER PLAN
TEST ON 2" RISER OK
WRAP AND SUPPORT PIPING IN FOOTING
09/07/2007 PLUMBING - ROUGH, SOIL Cancelled IVRS - RI canceled
09/07/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SEC B ALL BRANCH PIPING OK EXCEPT FOR LAUNDRY 2106, 2108 AND ELEVATOR SUMP AREAS
09/05/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
09/04/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
- BRANCH PIPING RMS 2114-1116 OK TO COVER
- PROVIDE CONTINUOUS SUPPORT AND UNIFORM SLOPE IN ALL AREAS
08/30/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SECTION B ALL MAIN TRUNK LINES OK TO COVER
BRANCH PIPING OK EXCEPT ALONG EAST SIDE MAIN;
BRANCH PIPING NOT YET INSTALLED. REDLINE CHANGES FOR TROUGH DRAINS.
08/29/2007 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
RETEST, WATER IN TRENCH.
REMOVE LOOSE DIRT AROUND FITTINGS.
REMOVE ROCKS OVER 3/4"
CORRECT SLOPE ON BRANCHES
PROVIDE TRAP AND VENT FOR TRENCH DRAINS PER SEC. 1001
PROVIDE TRAP SEAL PROTECTION
REDLINE CHANGE. PROVIDE APPROVED PLAN REVISION.
08/28/2007 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
WATER TEST FROM BUILDING EXTERIOR 8" TRUNK BLD DRAIN TO MY INITIAL AT UNIT 1107, BRANCH PIPING FOR UNITS 1107, 1108, 1109, 1110 MINUS STOOL
BRANCH PIPING UNITS 1118, 1119
08/27/2007 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
TEST TO BE IN PLACE AT TIME OF INSPECTION