Permit: T06CM06423

Parcel: 13320129C


Addresses:

6300 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
09/19/2008 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
2 @ LAMP POLE CAISSONS @ FRONT ENTRY
2 @ LAMP POLE CAISSONS @ REAR ENTRY
09/18/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH COURTYARD (WEST SIDE) 5 @ LIGHT POLE CAISSON FOOTINGS -- OK TO POUR PROGRESS AREAS
09/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH COURTYARD - EAST PORTION - 5 @ LIGHT POLE CAISSON FOOTINGS -- OK TO POUR
09/15/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NORTH COURTYARD - 4 @ LIGHT POLE CAISSON FOOTINGS
OK TO POUR
09/12/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 @ CAISSON LIGHT POLE FOOTINGS @ MAIN ENTRY AREA
OK TO POUR PROGRESS AREAS
09/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BARBEQUE @ POOL AREA @ 4'
OK TO GROUT
09/04/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ CAISSON LAMP POLE COLUMNS - 4 @ WEST SIDE
09/03/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LIGHT POLE CAISSONS - EAST @ 2; SOUTH @ 4
OK TO POUR PROGRESS AREAS
09/02/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
LIGHT POLE CAISSONS - 5 @ SOUTH COURTYARD
3 @ NORTH COURT YARD
08/29/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED
08/28/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
LIGHT POLE CAISSONS FLOODED
08/22/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
WEST SCREEN WALL FOOTING @ WILMOT - MAIN ENTRY
APPROX. 50' -- PARTIAL OK TO POUR
08/11/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SCREEN WALL FOOTING @ SE PORTION MAIN ENTRY AREA
APPROX. 45' - OK TO POUR
08/08/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
08/07/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
PASS THRU TO NORTH COURT YARD AND 3 AT F5 FOOTINGS
08/05/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
NE SITE SCREEN WALL FOOTING AND MONUMENT FOOTING
OK TO POUR FOOTING
08/04/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
07/30/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS FOR POOL EQUIPMENT SCREEN WALLS
07/07/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SCREEN WALL FOOTING (EAST) - APPROX. +/- 175'
OK TO POUR FOOTING
05/30/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FIREPLACE FOOTINGS @ SOUTH COURTYARD AS PER SK-4 (6/6/07) OK TO POUR PROGRESS AREA
05/21/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
TRELLIS FOOTINGS
NORTH COURTYARD - 4 @; SOUTH COURTYARD @ 6 AS PER
SK-012 DATED 3/12/08
SK-013 DATED 3/12/08; OK TO POUR
04/14/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTING FOR TRASH ENCLOSURE - OK TO POUR
04/07/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
03/10/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
DINING ROOM FOOTINGS LINE 0/9 TO 0/15
OK TO POUR
02/19/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTING EXTENSION @ LINE M/17
02/15/2008 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELED RAINED OUT
01/22/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
APPROX. 150' OF RETAINING WALL FOOTING
OK TO POUR WILMOT SIDE
01/18/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTING 120 L.F NORTH FROM SITE CORNER ON WEST SIDE OF SITE
01/17/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
STEM WALL @ G/11 TO H/8 -- OK TO GROUT
01/14/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING TIE IN @ LINE G/11 - OK TO POUR
01/02/2008 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
8 @ PIERS @ LINES AA/28-30, CC/28-30 OK TO POUR
12/26/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
12/20/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SW CORNER SCREEN WALL FOOTING -- OK TO POUR
12/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ C14, F8 (*), 4 @ C14, F7 FOOTINGS - OK TO POUR FOOTINGS

(*) - NOTE: UNABLE TO USE DETAIL #132 -
MODIFIED DETAIL #112 AS PER ARCHITECT
12/10/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 @ F.1 COLUMN FOOTINGS LINE G/11.5 TO G.9/10 OK TO POUR
12/07/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
12/06/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
3 @ COLUMN FOOTINGS @ BLDG "A" -- OK TO POUR
12/05/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
11/29/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL - APPROX. 60' WEST TO WILMOT
(FOOTINGS FOR S. SCREEN WALL COMPLETE) OK TO POUR
11/07/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL, MID-WEST TO WEST, APPROX 70' OF FOOTINGS
BLDG C-3 UNIT 1187, 1187 - 2 @ COLUMN FOOTINGS
11/06/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL: WEST TO EAST, APPROX. 70'
OK TO POUR
11/02/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS P.5/21 TO Q/22 -- OK TO POUR
11/01/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL RECALL LINE (P.5/21 TO Q/22)
10/31/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL; APPROX 105' OF FOOTING
RECESSED FOOTING @ CORRIDOR #2121
10/26/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL FOOTINGS APPROX 80'; EAST TO CENTER 2 @ COLUMN FOOTINGS @ LINES: L.1/5.5 AND L.5/5.6
OK TO POUR
10/25/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/24/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/23/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
BLDG "D"; F5 FOOTING & 2 @ C11 COLUMN FOOTINGS @ LINE P.5/6 TO Q/5.25 -- OK TO POUR
10/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
SOUTH SCREEN WALL APPROX. 120' FOOTINGS
OK TO POUR
10/16/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/11/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
4 @ F1 COLUMN FOOTINGS; L.2/12-13, G.5/14.5, G.9/15
OK TO POUR
10/08/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS @ L.8/18 TO L/19 -- OK TO POUR
10/05/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
10/04/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
10/03/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL RECALL
10/02/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
EAST FIRE WALL BLDG A, LINE H/17 TO L.5/17
FOOTING H/17 TO H/19 -- OK TO POUR
10/01/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
NOT READY WILL RECALL FOR 2 OCT
09/28/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL RECALL FOR 1 OCT
09/27/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS LINE J/16 TO J/19; G.9/17 TO J/17 OK TO POUR
09/26/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING G/22 TO G/26; FOOTINGS FOR THEATER #2159
LINE J/17 TO J/20.5 OK TO POUR
09/25/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
6 @ F3 COLUMN FOOTINGS; LINE M/8 TO 0/14
2 @ F5 COLUMN FOOTINGS - 1 @ F3 COLUMN FOOTINGS
LINE J/10 TO M/10 -- OK TO POUR
09/24/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING LINE D.5/26 - BLDG A
3 @ F3 COLUMN FOOTINGS
09/21/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL RECALL FOR SEP. 24
09/20/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 2 AT #F8 COLUMN FOOTINGS AT AA/30 & BB/30 AND 2 AT F7 COLUMN FOOTINGS AT BB.5/30 & BB.75/30
2) OK TO POUR
09/19/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) 5 AT F3 COLUMN FOOTINGS; 2 AT F8, 2 AT F8, 2 AT F7 COLUMN FOOTINGS
09/18/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTING #DD/27;
ELEVATOR #2 LINE G.9/2.5 TO G.8/25
STAIRS #6, G.9/15
OK TO POUR PROGRESS AREAS
09/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS 1 @ C12/F10 - LINE H.8/11.5
2 @ COLUMN FOOTINGS C9/F3, LINE G.9/10-G.9/11
ELEVATOR PIT - G/11.5 TO G/12
OK TO POUR PROGRESS AREAS
09/14/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COLUMN FOOTINGS @ PARTY WALL E/22-E/24; D.5/24 TO D.7/22; LINE D E/14.4 TO F/14.4 OK TO POUR
09/13/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS LINE 0.5/24 TO H/24;
EAST ELEVATOR G.8/25 TO G.8/26
OK TO POUR PROGRESS AREAS
09/10/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
09/07/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
09/06/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
WILL RECALL FOR 7 SEP
09/05/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
REPLACEMENT STEM WALL @ LINE P/1 AS PER RFI DETAIL
#10305.00-42 DATED 8/17/07
FOOTING K/24 TO O/24 -- OK TO POUR
09/04/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS & F-1, F-2 COLUMN FOOTINGS
LINES L.5/9 TO L.5/17 -- OK TO POUR
09/01/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1. CONTINUOUS FOOTING @ GRID L.5/17/20.5
2. FOOTING FOR HEAD WALL AT WEST SIDE OF SITE @ 1/O-P
08/30/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTING LINE K/8 TO M/9 (COMMON WALL) OK TO POUR
08/29/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
08/28/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS: LINES P.5/19 TO O.5/22
OK TO POUR
08/27/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS LINE H/24 TO U/24; P.5/14 TO P.5/20 OK TO POUR
08/24/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS; LINE U/19-20; U/22-25 OK TO POUR
08/23/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS LINE L.5/7.5 TO P.5/7
U/10 TO T/11.5
OK TO POUR PROGRESS AREAS
08/22/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
ELEVATOR PIT @ LINE T/15;
CONTINUOUS FOOTINGS @ G.9/19 TO E/22;
OK TO POUR PROGRESS AREAS
08/21/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINOUS FOOTINGS LINE U/8 TO U/11 AS PER CHANGE;
LINE P/6 TO P.5/20 OK TO POUR PROGRESS AREAS
08/20/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) RETAINING WALL SOUTH LINE U/5-U/20; ELEVATOR PIT AT H/25 OK TO POUR PROGRESS FOOTINGS SPECIAL INSPECTIONS
08/17/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTING LINE U/1 TO U/14;
LINE H.9/7 TO H.9/5.5
OK TO POUR PROGRESS AREAS
08/16/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
COMMON WALL FOOTING @ F.5/10 TO G/14.4;
FOOTING @ G.8/8 TO G.8/5
OK TO POUR PROGRESS AREAS
08/14/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTING @ LINE P/1 TO Q/1
OK TO POUR FOOTING
08/13/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
RETAINING WALL FOOTING @ LINE G/.5 TO N/.5
OK TO POUR FOOTING
08/10/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
1) WEST RETAINING WALL-WILL RECALL FOR 13 AUG
08/09/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
UNIT B: LINE A/14 - F/11
E/16 - F/14
CONTINUOUS FOOTINGS - OK TO POUR PROGRESS AREAS
08/08/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS A/19 - A/14
E/21 - E/19
OK TO POUR
08/07/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
CONTINUOUS FOOTINGS @ A/21 TO A/19; E/20 TO E/23
OK TO POUR
08/06/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
CONTRACTOR CANCELLED
RAINED OUT
08/03/2007 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
FOOTINGS A/20.5 TO C/2.6 -- OK TO POUR
DETAILS #23 PAGE S1.22 & #101-102 S2.11
S1.22/#23
S2.11/101 & 102
08/02/2007 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
INFORMATION ONLY