Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* 2 @ LAMP POLE CAISSONS @ FRONT ENTRY 2 @ LAMP POLE CAISSONS @ REAR ENTRY |
|
| 09/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH COURTYARD (WEST SIDE) 5 @ LIGHT POLE CAISSON FOOTINGS -- OK TO POUR PROGRESS AREAS |
|
| 09/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH COURTYARD - EAST PORTION - 5 @ LIGHT POLE CAISSON FOOTINGS -- OK TO POUR |
|
| 09/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NORTH COURTYARD - 4 @ LIGHT POLE CAISSON FOOTINGS OK TO POUR |
|
| 09/12/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 6 @ CAISSON LIGHT POLE FOOTINGS @ MAIN ENTRY AREA OK TO POUR PROGRESS AREAS |
|
| 09/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BARBEQUE @ POOL AREA @ 4' OK TO GROUT |
|
| 09/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 @ CAISSON LAMP POLE COLUMNS - 4 @ WEST SIDE |
|
| 09/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LIGHT POLE CAISSONS - EAST @ 2; SOUTH @ 4 OK TO POUR PROGRESS AREAS |
|
| 09/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LIGHT POLE CAISSONS - 5 @ SOUTH COURTYARD 3 @ NORTH COURT YARD |
|
| 08/29/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED |
|
| 08/28/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* LIGHT POLE CAISSONS FLOODED |
|
| 08/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* WEST SCREEN WALL FOOTING @ WILMOT - MAIN ENTRY APPROX. 50' -- PARTIAL OK TO POUR |
|
| 08/11/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SCREEN WALL FOOTING @ SE PORTION MAIN ENTRY AREA APPROX. 45' - OK TO POUR |
|
| 08/08/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 08/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PASS THRU TO NORTH COURT YARD AND 3 AT F5 FOOTINGS |
|
| 08/05/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NE SITE SCREEN WALL FOOTING AND MONUMENT FOOTING OK TO POUR FOOTING |
|
| 08/04/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 07/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS FOR POOL EQUIPMENT SCREEN WALLS |
|
| 07/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SCREEN WALL FOOTING (EAST) - APPROX. +/- 175' OK TO POUR FOOTING |
|
| 05/30/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FIREPLACE FOOTINGS @ SOUTH COURTYARD AS PER SK-4 (6/6/07) OK TO POUR PROGRESS AREA |
|
| 05/21/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* TRELLIS FOOTINGS NORTH COURTYARD - 4 @; SOUTH COURTYARD @ 6 AS PER SK-012 DATED 3/12/08 SK-013 DATED 3/12/08; OK TO POUR |
|
| 04/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTING FOR TRASH ENCLOSURE - OK TO POUR |
|
| 04/07/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 03/10/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* DINING ROOM FOOTINGS LINE 0/9 TO 0/15 OK TO POUR |
|
| 02/19/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTING EXTENSION @ LINE M/17 |
|
| 02/15/2008 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELED RAINED OUT |
|
| 01/22/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* APPROX. 150' OF RETAINING WALL FOOTING OK TO POUR WILMOT SIDE |
|
| 01/18/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINING WALL FOOTING 120 L.F NORTH FROM SITE CORNER ON WEST SIDE OF SITE |
|
| 01/17/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* STEM WALL @ G/11 TO H/8 -- OK TO GROUT |
|
| 01/14/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING TIE IN @ LINE G/11 - OK TO POUR |
|
| 01/02/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 8 @ PIERS @ LINES AA/28-30, CC/28-30 OK TO POUR |
|
| 12/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 12/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SW CORNER SCREEN WALL FOOTING -- OK TO POUR |
|
| 12/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 @ C14, F8 (*), 4 @ C14, F7 FOOTINGS - OK TO POUR FOOTINGS (*) - NOTE: UNABLE TO USE DETAIL #132 - MODIFIED DETAIL #112 AS PER ARCHITECT |
|
| 12/10/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 6 @ F.1 COLUMN FOOTINGS LINE G/11.5 TO G.9/10 OK TO POUR |
|
| 12/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 12/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 3 @ COLUMN FOOTINGS @ BLDG "A" -- OK TO POUR |
|
| 12/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 11/29/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL - APPROX. 60' WEST TO WILMOT (FOOTINGS FOR S. SCREEN WALL COMPLETE) OK TO POUR |
|
| 11/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL, MID-WEST TO WEST, APPROX 70' OF FOOTINGS BLDG C-3 UNIT 1187, 1187 - 2 @ COLUMN FOOTINGS |
|
| 11/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL: WEST TO EAST, APPROX. 70' OK TO POUR |
|
| 11/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS P.5/21 TO Q/22 -- OK TO POUR |
|
| 11/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WILL RECALL LINE (P.5/21 TO Q/22) |
|
| 10/31/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL; APPROX 105' OF FOOTING RECESSED FOOTING @ CORRIDOR #2121 |
|
| 10/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL FOOTINGS APPROX 80'; EAST TO CENTER 2 @ COLUMN FOOTINGS @ LINES: L.1/5.5 AND L.5/5.6 OK TO POUR |
|
| 10/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 10/24/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 10/23/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 10/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* BLDG "D"; F5 FOOTING & 2 @ C11 COLUMN FOOTINGS @ LINE P.5/6 TO Q/5.25 -- OK TO POUR |
|
| 10/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* SOUTH SCREEN WALL APPROX. 120' FOOTINGS OK TO POUR |
|
| 10/16/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 10/11/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 4 @ F1 COLUMN FOOTINGS; L.2/12-13, G.5/14.5, G.9/15 OK TO POUR |
|
| 10/08/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS @ L.8/18 TO L/19 -- OK TO POUR |
|
| 10/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 10/04/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 10/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WILL RECALL |
|
| 10/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* EAST FIRE WALL BLDG A, LINE H/17 TO L.5/17 FOOTING H/17 TO H/19 -- OK TO POUR |
|
| 10/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* NOT READY WILL RECALL FOR 2 OCT |
|
| 09/28/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WILL RECALL FOR 1 OCT |
|
| 09/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS LINE J/16 TO J/19; G.9/17 TO J/17 OK TO POUR |
|
| 09/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING G/22 TO G/26; FOOTINGS FOR THEATER #2159 LINE J/17 TO J/20.5 OK TO POUR |
|
| 09/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 6 @ F3 COLUMN FOOTINGS; LINE M/8 TO 0/14 2 @ F5 COLUMN FOOTINGS - 1 @ F3 COLUMN FOOTINGS LINE J/10 TO M/10 -- OK TO POUR |
|
| 09/24/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING LINE D.5/26 - BLDG A 3 @ F3 COLUMN FOOTINGS |
|
| 09/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WILL RECALL FOR SEP. 24 |
|
| 09/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 2 AT #F8 COLUMN FOOTINGS AT AA/30 & BB/30 AND 2 AT F7 COLUMN FOOTINGS AT BB.5/30 & BB.75/30 2) OK TO POUR |
|
| 09/19/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) 5 AT F3 COLUMN FOOTINGS; 2 AT F8, 2 AT F8, 2 AT F7 COLUMN FOOTINGS |
|
| 09/18/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTING #DD/27; ELEVATOR #2 LINE G.9/2.5 TO G.8/25 STAIRS #6, G.9/15 OK TO POUR PROGRESS AREAS |
|
| 09/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS 1 @ C12/F10 - LINE H.8/11.5 2 @ COLUMN FOOTINGS C9/F3, LINE G.9/10-G.9/11 ELEVATOR PIT - G/11.5 TO G/12 OK TO POUR PROGRESS AREAS |
|
| 09/14/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COLUMN FOOTINGS @ PARTY WALL E/22-E/24; D.5/24 TO D.7/22; LINE D E/14.4 TO F/14.4 OK TO POUR |
|
| 09/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS LINE 0.5/24 TO H/24; EAST ELEVATOR G.8/25 TO G.8/26 OK TO POUR PROGRESS AREAS |
|
| 09/10/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 09/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 09/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* WILL RECALL FOR 7 SEP |
|
| 09/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* REPLACEMENT STEM WALL @ LINE P/1 AS PER RFI DETAIL #10305.00-42 DATED 8/17/07 FOOTING K/24 TO O/24 -- OK TO POUR |
|
| 09/04/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS & F-1, F-2 COLUMN FOOTINGS LINES L.5/9 TO L.5/17 -- OK TO POUR |
|
| 09/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. CONTINUOUS FOOTING @ GRID L.5/17/20.5 2. FOOTING FOR HEAD WALL AT WEST SIDE OF SITE @ 1/O-P |
|
| 08/30/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING LINE K/8 TO M/9 (COMMON WALL) OK TO POUR |
|
| 08/29/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
| 08/28/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS: LINES P.5/19 TO O.5/22 OK TO POUR |
|
| 08/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS LINE H/24 TO U/24; P.5/14 TO P.5/20 OK TO POUR |
|
| 08/24/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS; LINE U/19-20; U/22-25 OK TO POUR |
|
| 08/23/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS LINE L.5/7.5 TO P.5/7 U/10 TO T/11.5 OK TO POUR PROGRESS AREAS |
|
| 08/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ELEVATOR PIT @ LINE T/15; CONTINUOUS FOOTINGS @ G.9/19 TO E/22; OK TO POUR PROGRESS AREAS |
|
| 08/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINOUS FOOTINGS LINE U/8 TO U/11 AS PER CHANGE; LINE P/6 TO P.5/20 OK TO POUR PROGRESS AREAS |
|
| 08/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) RETAINING WALL SOUTH LINE U/5-U/20; ELEVATOR PIT AT H/25 OK TO POUR PROGRESS FOOTINGS SPECIAL INSPECTIONS |
|
| 08/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTING LINE U/1 TO U/14; LINE H.9/7 TO H.9/5.5 OK TO POUR PROGRESS AREAS |
|
| 08/16/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* COMMON WALL FOOTING @ F.5/10 TO G/14.4; FOOTING @ G.8/8 TO G.8/5 OK TO POUR PROGRESS AREAS |
|
| 08/14/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINING WALL FOOTING @ LINE P/1 TO Q/1 OK TO POUR FOOTING |
|
| 08/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* RETAINING WALL FOOTING @ LINE G/.5 TO N/.5 OK TO POUR FOOTING |
|
| 08/10/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* 1) WEST RETAINING WALL-WILL RECALL FOR 13 AUG |
|
| 08/09/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* UNIT B: LINE A/14 - F/11 E/16 - F/14 CONTINUOUS FOOTINGS - OK TO POUR PROGRESS AREAS |
|
| 08/08/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS A/19 - A/14 E/21 - E/19 OK TO POUR |
|
| 08/07/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* CONTINUOUS FOOTINGS @ A/21 TO A/19; E/20 TO E/23 OK TO POUR |
|
| 08/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED RAINED OUT |
|
| 08/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTINGS A/20.5 TO C/2.6 -- OK TO POUR DETAILS #23 PAGE S1.22 & #101-102 S2.11 S1.22/#23 S2.11/101 & 102 |
|
| 08/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* INFORMATION ONLY |