Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2008 | ENGINEERING - FINAL | Approved | Contractor provided asbuilts for site. Approved by Sunrise Engineering. | |
| 04/03/2008 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Contractor needs to complete punch list dated 3/27/08. | |
| 03/27/2008 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Stabilize all areas disturbed by construction. 2- Clean Elvira Rd. 3- Separate all construction activity from public access. 4- Separate all construction debris from public access. 5- Remove all temp fencing. 6- Remove port-a-potty. 7- Have all design changes approved at 201 N. Stone. 8- Provide easement information. 9- Address basin side slopes. 10- Install H.C. signage. 11- Backfill all open trenches. 12- Clean parking area. 13- Provide letter from engineer for site cert. per C.O.T. Drainage manaul, chapter XIV, section 14.2 (7) Spoke to mike site super in regards to punch list. |
|
| 02/20/2008 | ENGINEERING - FINAL | Denied | NOT READY COMPLETE ALL SITE WORK. |