Inspection History Details
Inspection Status: Partial Approval
Inspection History: LANDSCAPE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2009 | LANDSCAPE - FINAL | Partial Approval | 1. Water Harvesting is required per Note 7 2. Adjust irrigation appropriately to stop over watering. |
|
| 11/20/2009 | LANDSCAPE - FINAL | Approved | ||
| 10/22/2009 | LANDSCAPE - FINAL | Denied | 1) Water Harvesting required per Note 7 2) Remove all weeds from Landscape areas. 3) Replace all missing plants 4) Install DG between side walk and curb 5) Clear tree branches from sidewalks along Liberty Ave. 6) Adjust irrigation appropriately. 7) Pick-up trash from site. 8) Remove weeds from basin 9) Establish native seed mix within basin 10) Install DG behind building and exposed areas 11) Install missing NPPO plants 12) Install curbs along alley. |