Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2008 | ENGINEERING - FINAL | Approved | ||
| 09/04/2008 | ENGINEERING - FINAL | Not ready for Inspection | OK to extend temp C of O. Contractor still needs to: 1- Clean up and remove all construction debris and material. 2- Provide gate at sidewalk access to R.O.W. northeast corner of site. 3- Remove plastic from truncated domes. 4- Double gates at driveway to Magnolia: Grind middle gate stop flush with pavement. 5- Provide roof drains splash pads at landscape areas. |
|
| 08/08/2008 | ENGINEERING - FINAL | Partial Approval | OK for temp C of O. Must place temp fence between active construction and public acess to building and site. Complete all items on 8/7/08 inspection. |
|
| 08/07/2008 | ENGINEERING - FINAL | Denied | Not ready complete the following items prior to final C of O. 1) Clean up and remove all construction debris and material. 2) backfill and establish grade near all sidewalks and curbs. 3) Barricade all areas where on going construction activity is occuring to prevent public acess. 4) Cap abandoned stormdrain in catch basin and grout bottom to match outlet pipe invert. Call for reinspection. |