Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2007 | ENGINEERING - FINAL | Approved | CORRECTION NOTICE ISSUED 3 DAYS -PLACE CONTROLS AROUND MATERIAL STOCKPILES -CLEAN UP STUCCO/MORTAR WASHOUT ENSURE ALL DRAINAGE/STORMDRAINS ARE PROTECTED -ENSURE ALL WASHOUT-INCLUDING PAINT-IS CONTAINED PER EPA REGULATIONS $75 RE-INSPECTION FEE AND NOTICE OF VIOLATION FAXED INSPECTION TO 602-438-8183 |
|
| 08/02/2007 | ENGINEERING - FINAL | Approved | NATE 602-757-1392 -PER LEE RAY CHANGES TO PARKING AREA NEED REDLINES-TO BE APPROVED BY WAYNE BOGDAN OR LEE RAY AT COUNTER -TRUNCATED DOMES AT SOUTH END OF NEW RAMP AND AT RESTAURANT ENTRANCE RAMP NOT ON PLAN. ENTRANCE RAMP NOT ADA COMPLIANT SITE DOES NOT MATCH SITE PLAN DISCUSSED THIS INSPECTION WITH DAVE ROBERTS THIS IS BEING APPROVED UNDER THE DIRECTION OF LEE RAY-ALL OUTSTANDING ISSUES TO BE ADDRESSED UNDER BUILDING FINAL INCLUDING ALL ADA ACCESS CONCERNS |
|
| 08/01/2007 | ENGINEERING - FINAL | Not ready for Inspection | STILL ON SITE IN PARKING AREA: ROLL OFF DUMPSTER- removed PORTA TOILETS- removed MOBILE MINIS- removed SITE WORK NOT COMPLETE YET ADA WALKWAY-IN TO WILDAN FOR DETAILS (WEISS-MAGNES ARCHITECTS) RESTRIPING- not cp GENERAL SITE CLEAN UP- not cp clean up and remove concrete wash out at ne corner of bldg and e of dumpster remove all construction debris including temp wood ramp at w side door -truncated domes not req'd at broadway sidewalk-not included on plan at s end of h/c ramp or at building access either side of PAAL |
|
| 08/01/2007 | ENGINEERING - FINAL | Not ready for Inspection | RESTRIPING- not cp GENERAL SITE CLEAN UP- not cp -truncated domes not req'd at broadway sidewalk-not included on plan at s end of h/c ramp or at building access either side of PAAL- Lee Ray checking with zoning-final decision is his for ADA compliance changes to h/c parking spaces (location) per Lee Ray |
|
| 07/27/2007 | ENGINEERING - FINAL | Denied | Site not ready ADA access from Broadway to building not constructed Parking lot not restripped ADA parking not restripped 3 mobil storage units in parking lot, blocking 7 stalls 6ft X 15ft open batch in asphalt parking area, blocking two parking stalls. Construction debris in parking lot. |
|
| 07/26/2007 | ENGINEERING - FINAL | Not ready for Inspection | STILL ON SITE IN PARKING AREA: ROLL OFF DUMPSTER PORTA TOILETS MOBILE MINIS SITE WORK NOT COMPLETE YET ADA WALKWAY-IN TO WILDAN FOR DETAILS (WEISS-MAGNES ARCHITECTS) RESTRIPING GENERAL SITE CLEAN UP |