Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/28/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/26/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SHALL PROVIDE LADDER FOR ROOF ACCESS |
|
| 09/21/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 08/02/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* INSTALL REHEAT ON ROOF CALL BACK FOR FINAL |
|
| 08/01/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* ITEMS #2, #4, #8 FROM 7/27/07 INSPECTION TO BE COMPLETED WITH 03035 INSPECTION FOR FINAL |
|
| 07/27/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. APPROVAL OF 03005, 03035, 03036 WAITING ON REVISED APPROVED PLAN WITH REDLINES ON SITE. 2. PROVIDE LONG RADIUS DRAINAGE FITTINGS FOR DISPOSAL DRAINAGE FROM ITEM #4 7/26/07 INSP 3. SUPPORT WATER PIPING FOR 2-COMP & 3-COMP SINK FROM 7/26/07 ITEM #5 4. WATER HEATER VENTING STILL NOT CORRECT. FROM ITEM #8 7/26/07 5. WATER HEATER T&P STILL NOT CORRECT FROM ITEM #9 7/26/07 INSP. 6. WATER HEATER EXPANSION TANK NOT PROPERLY SECURED ITEM #10 - 7/26/07 INSP 7. OPEN SANITARY DRAIN AT EMPLOYEE RESTROOM & HALLWAY DRAIN VERBAL FROM 7/26/07 INSP 8. INSTALL FILTER DRAIN PER REQUEST ITEM #3 7/26/07 INSP. |
|
| 07/26/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. CALL IN ALL INSPECTIONS FOR PLUMBING THAT HAVE NOT BEEN APPROVED. 2. SUPPORT ALL WATER & INDIRECT DRAINAGE PIPING AT COOK LINE. 3. PROVIDE 1" AIR GAP AT WATER FILTER DRAIN & TRENCH DRAIN AT ICE MACHINE & SECURE TUBING 4. COMPLETE INSTALLATION OF ALL FIXTURES (DISPOSAL, GREEN) 5. SUPPORT WATER PIPING AT 2-COMP & 3-COMP SINKS 6. ALL FLOOR SINKS TO HAVE GRATES 7. REPAIR TRENCH DRAIN GRATE TO AVOID TRIPPING HAZARD AT COOK LINE. 8. WATER HEATER TO HAVE CORRECT VENT TERMINATION THRU ROOF TO APPROVED VENT CAP 9. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN SHALL GRAVITY DRAIN TO DAYLIGHT 10. WATER HEATER EXPANSION TANK TO BE SUPPORTED AND SECURED PROPERLY FOR WEIGHT & MOVEMENT. |