Permit: T06CM04873

Parcel: 14117014C

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
04/23/2008 ENGINEERING - FINAL Approved
04/23/2008 ENGINEERING - FINAL Approved CP-COMPLETE ALL ASPHALT PATCHES

CP-CLEAN UP WASH OUT AND CONSTRUCTION DEBRIS S OF SCREEN WALL

CP*-ADDRESS ADA ISSUES-APPROVED REVISION MUST BE READY TO BUILD BEFORE TEMP C OF O. THIS INCLUDES H/C PARKING STALLS TOO STEEP ON N SIDE FO BLDG AND ADA ACCESSIBLE ROUTE FROM ROW TO 8265.

CP-INSTALL BIKE LOCKERS PER PLAN (DEV PLAN)--2 BIKE LOCKERS INSTALLED NE CORNER OF BLDG TOTAL OF 4 EACH CLASS 1 + 2 INSTALLED ON SITE

CP*REVISED DEVELOPMENT PLAN ON SITE-NO REVISED GRADING PLAN
04/21/2008 ENGINEERING - FINAL Partial Approval *-ADDRESS ADA ACCESSIBLE ROUTE FROM 8255 THROUGH SITE---ADA ROUTE INSTALLED PER DEVELOPMENT PLAN

CP-BICYCLE PARKING REQUIRED 3 CLASS 1 AND 3 CLASS 2 (PER DEV PLAN) 4 CLASS 2 ON SITE DO NOT MEET COT DESIGN STDS (2 @ EA BLDG)--2 BIKE LOCKERS HAVE BEEN INSTALLED

*REVISED DEVELOPMENT PLAN ON SITE NO REVISED GRADING PLAN
03/26/2008 ENGINEERING - FINAL Correction Required -ADDRESS ADA ACCESSIBLE ROUTE FROM 8255 THROUGH SITE-NO ADA ACCESS AT THIS TIME
-ADDRESS ADA ACCESSIBLE PARKING FOR THIS BUILDING
-BICYCLE PARKING REQUIRED 3 CLASS 1 AND 3 CLASS 2 (PER DEV PLAN) 4 CLASS 2 ON SITE DO NOT MEET COT DESIGN STDS (2 @ EA BLDG)
02/29/2008 ENGINEERING - FINAL Correction Required BEFORE C OF O
ADDRESS H/C ACCESSIBLE ROUTE FROM WEST BUILDING TO EAST BUILDING. REVISED ARCHITECHTURAL DRAWING/SITE PLAN SHOWS BOTH FFE'S AT SAME ELEVATION. THIS IS NOT THE SITE CONDITION. ALL CHANGES MUST BE REVIEWED AND APPROVED. STAMPED PLANS MUST BE ON SITE FOR C OF O INSPECTION.