Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM04580
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
10/05/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* COMPLETE ALL CORRECTIONS BEFORE FINAL |
|
09/21/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. SMOKE DETECTORS NEEDED IN EVERY ROOM & HALLWAY (BEDROOM) WORKING AND PROPERLY INSTALLED INTERCONNECTED THROUGH STRUCTURE. 2. NEED GFI PROTECTION FOR ALL BATHROOM AND KITCHEN COUNTER AND EXTERIOR RECEPTACLES. 3. IDENTIFY ALL PANEL DIRECTORY'S AND FILL OPEN BREAKER SPACES. 4. HAVE 3 WIRE RECEPTACLES WITHOUT GROUND THROUGOUT. 5. HAVE SHOWER LIGHTING FIXTURES THAT ARE NOT PER CODE. 6. HAVE OPEN BROKEN WIRING THROUGHOUT 7. USE ONLY BREAKERS LISTED FOR PANELS 8. NEED WORKING LIGHT OR SWITCHED RECEPTACLE IN ALL HABITABLE ROOMS CONTROL BY WALL SWITCH. 9. OPEN WIRING THROUGHOUT ATTIC & BASEMENT. USE QUALIFIED CONTRACTOR/PERMIT |