Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/16/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - URINALS REQUIRE VACUUM BREAKERS AND A RIGDID PIPE CONNECTION. - HOSE BIB REQUIRES A VAC BREAKERS - ALL FIXTURES REQUIRE CAULKING AT CONNECTION TO FLOOR OR WALL. - TOILETS REQUIRED TO HAVE OPEN FRONT SEATS. - A SINK HAS BEEN ADDED WITHOUT INSPECTION, THIS MUST BE REMOVED OR PERMITTED. - THE CONNECTION TO THE EXISTING PLUMBING SHALL BE EXPOSED FOR INSPECTION. - WATER HEATER T&P NOT TERMINATED, PIPING NOT SUPPORTED. VALVE NOT FULL PORT. |
|
| 08/15/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* POST SUITE NUMBERS PROVIDE PERMITS AND PLANS WAITED AT ALLEGRA PRINT 11:45-11:55 YOU MAY LEAVE A CONTACT PHONE # IF YOU WISH AND I WILL CALL BEFORE COMING. |