Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2009 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE 2) OK FOR FINAL |
|
| 08/26/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A 60 AMP DISCONNECT WITH 45 OR 50 AMP FUSES FOR LARKIN CONDENSOR 2) PERMANENTLY MARK THE BOX ON UNIT DATA PLATE NEXT TO THE HEAT STRIP INSTALLED AND FUSE ACCORDINGLY. IF NONE, MARK "NONE" 3) CAP OFF THE VENTS USED ON CONDENSATE DRAINS NOT REQUIRED TO HAVE VENT 4) PROVIDE 15 AMP FUSES IN SMALL CONDENSOR DISCONNECTS 5) ELECTRIC DISCONNECTS WIRED BACKWARDS. LINE AND LIDS SWITCHED 6) CIRCUIT BREAKER NOT ADEQUATE FOR LARKIN CONDENSOR 7) BREAKERS FOR A/C UNIT #1 TO SMALL |
|
| 06/10/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LARKIN CONDENSOR ON ROOF NOT FUSED CORRECTLY, ELEC. DISCONNECT TO SMALL 2. PERMANENTLY I.D. ALL EQUIPMENT ON ROOF 3. MARK UNIT DATA PLATES AND FUSE ACCORDINGLY 4. REMOVE IN LINE CONDENSATE TRAP & PROVIDE TRAPS AT EACH UNIT PER MANUFACTURES INSTALL INSTRUCTIONS 5. VENTS GO DOWNSTREAM OF THE TRAP 6. 2 SMALL CONDENSORS OVERFUSED! 7. PROVIDE AIR BALANCE REPORT |