Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2009 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/06/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* OK TO COVER WALL AT 3-COMP SINK |
|
| 05/04/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - INSPECTION OF IN WALL PIPING FOR HAND SINK - SECURE TUBING IN WALL AND REMOVE EXCESS FLUX FROM PIPE AND FITTINGS |
|
| 04/20/2009 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. RESTROOM DOES NOT MEET HANDICAPPED REQUIREMENTS 2. MISSING CLEANOUT AT FLOOR SINK/HAND SINK 3. PROVIDE STERILIZATION AND CLEAN BACTERIA REPORT 4. TWO COMPARTMENTS OF THE 3-COMP SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER 5. MISSING HAND SINK NEXT TO 3-COMP SINK WATER HEATER REQUIRES A PAN WATER HEATER REQUIRES VACUUM RELIEF VALVE |