Permit: T06CM03879

Parcel: 10604024A

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
05/15/2009 PLUMBING - FINAL Approved IVRS - Inspection :*
05/06/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
OK TO COVER WALL AT 3-COMP SINK
05/04/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
- INSPECTION OF IN WALL PIPING FOR HAND SINK
- SECURE TUBING IN WALL AND REMOVE EXCESS FLUX FROM PIPE AND FITTINGS
04/20/2009 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. RESTROOM DOES NOT MEET HANDICAPPED REQUIREMENTS
2. MISSING CLEANOUT AT FLOOR SINK/HAND SINK
3. PROVIDE STERILIZATION AND CLEAN BACTERIA REPORT
4. TWO COMPARTMENTS OF THE 3-COMP SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER
5. MISSING HAND SINK NEXT TO 3-COMP SINK
WATER HEATER REQUIRES A PAN
WATER HEATER REQUIRES VACUUM RELIEF VALVE