Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2009 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/19/2009 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. OUTLET ON WEST WALL COOLER HAS 2 BROKEN OUTLETS ON TOP AND 1 OUTLET COVER PLATE MISSING FOR GFI ON FRONT OF COOLER 2. NEED TO CLEAN PAINT ON PANEL 3. ARC SHIELDS ON SOUTH WALL GFI's AND SWITCH 4. NEED FUSED DISCONNECTS FOR AC's & COOLERS 5. DISCONNECTS NEED BONDING 6. STRAPPING AND BRACING |
|
| 11/18/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK PREVIOUS ITEMS FINISH ELECTRICAL - PLATE & EQUIPMENT INSTALLS |
|
| 11/04/2008 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. FINISH HIGH LEG MARKING 2. FINISH ANGLE PULL 3. VERIFY OUTDOOR LIGHTING WITH ENGINEER |
|
| 10/29/2008 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. EXPOSE ELECTRIC BEHIND BLACK PLASTIC TO INSPECT 2. IDENTIFY PANEL FOR HIGH LEG & CONDUCTORS IN PANEL 3. PULL BOX TO BE AS PER 314.28 (A)(2) 4. NEED "R" PINS AT SERVICE 5. FINISH #1, 3, 4, 5 PREVIOUS INSPECTION 6. SUPPORT JUNCTION BOX TO CASES 7. GROUND TO BOX FOR CASES TO BE SIZED PER 250.122 |
|
| 10/23/2008 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. MANUFACTURES FIXTURE CLIPS TO BE EFFECTIVE AND SECURELY ATTACHED TO GRID 410.16 2. JUNCTION BOXES TO BE ACCESSIBLE 3. BOXES MORE THAN 1/8" AROUND 314.21 4. MAINTAIN ANGLE PULL DISTANCES IN PULL BOX 5. PANEL SCHEDULE TO BE AS PER 408.4 LEGIBLE AND DISTINGUISHABLE FROM ONE ANOTHER -- NO ABBREVIATIONS 6. PLEASE HAVE ELECTRICIAN PRESENT TO OPEN EQUIPMENT |
|
| 11/26/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK TEP 2) CALL AFTER SWITCH OVER |
|
| 11/19/2007 | ELECTRIC - FINAL | Denied | 1) PROPERLY ATTACH/SECURE MAST BRACE 2) INDENTIFY NEUTRALS AS THEY LEAVE WEATHER HEADS 3) TIGHTEN/TORQUE ALL CONNECTIONS 4) INSTALL MISSING LOCK NUTS (EACH SIDE OF NIPPLES) 5) VERIFY YOU HAVE CORRECT ADDRESS 6) CLEAN UP BONDING AS DISCUSSED 7) SPECIAL INSPECTION FOR $150 PAID WITH CHECK #1788 |
|
| 09/28/2007 | ELECTRIC - FINAL | Denied | 1) PLAN CALLS FOR 500 MCM CONDUCTOR SIZE TO 400 AMP SERVICE DISC. S.W. 2) BOND NEUTRALS IN SERVICE DISCONNECTS USING BOND SCREW OR LINK. ARRANGE GROUND CONDUCTORS SO AS TO NOT CREATE A PARALLEL PATH 3) BOND WATER AND GAS PIPING TO NEW SERVICE 4) PLANS CALL FOR 250 MCM CONDUCTOR SIZE TO NEW PANEL "A" 5) CONTRACTOR REQUESTED EARLY INSP.-PAID $108.00 WITH CHECK #1754 |
|
| 09/20/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/27/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PARTIAL INSPECTION -- PHASE TAPE TO BE ARRANGED SO IT DOES NOT BLOCK CONDUCTOR MARKINGS 1. SECURE BOTH MAST BRACES TO THE MAST THAT WILL CARRY THE SERVICE DROP AND AIM THEM IN THE DIRECTION OF THE SERVICE DROP NOT OFF TO THE SIDE - MAKE SURE THAT THEY ANCHOR INTO STRUCTURE, NOT JUST ROOF SHEATING -- NEC 230.28 2. IDENTIFY SERVICE NEUTRAL AS THEY LEAVE WEATHERHEAD NEC 200.6B 3. IDENTIFY "SERVICE DISCONNECTS" AS SUCH - NEC 230.70B 3A. CONDUCTORS TO HAVE PROPER BENDING RADIUS - NEC 300.34 4. 400 AMP DISCONNECT TO HAVE NEUTRAL KIT INSTALLED NEC 110.3B, NEUTRAL RAN TO IT AND BONDED TO ITS ENCLOSURE -- NEC 250.24C 5. DO NOT STACK BONDING/GROUNDING LUGS - NEC 110.3B 6. REMOVE PAINT UNDER LUGS - NEC 250.12 7. EXPOSE GROUND RODS FOR INSPECTION 8. GROUNDING ELECTRODE CONDUCTOR TO CONNECT TO SERVICE NEUTRAL DIRECTLY OR VIA A PROPERLY SIZED BONDING JUMPER - NEC 250.24 9. 200 AMP METER BASE LISTED FOR TOP FEED ONLY - NEC 110.3B, 312.6, 300.34 10. BONDING CONDUCTOR FOR NIPPLE 200 AMP METER BASE TO DISCONNECT IS UNDERSIZED - NEC 250.102C 11. TIGHTEN ALL CONNECTIONS - NEC 110.14A 12. 2" EMT FOR FEEDER OVERFILLED - NEC ANNEX C CHART (APPEARS) PARTIAL INSPECTION ONLY - CORRECTIONS TO NUMEROUS TO LIST - HAVE QUALIFIED ELECTRICIAN GO THROUGH THIS SERVICE AND BRING TO CODE. APPROVED PLANS TO BE ON SITE. |
|
| 08/20/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) WORK IN PROGRESS, NO APPROVED PLANS YET |
|
| 07/16/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSPECTION CALLED IN BEFORE READY NEED TO PAY REINSPECTION FEE DO NOT CALL BEFORE READY |
|
| 06/15/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED PLAN ON SITE 2) SERVICE DISCONNECTS TO BE GROUPED NEC 230.72 A 3) IDENTIFY SERVICE DISCONNECT-NEC 230.70 B 4) NEED SEALING LOCK NUTS-NEC 312 5) HAVE OBJECTIONABLE CURRENT-NEC 250.6 6) NEUTRALS TO BOND TO SERVICE DISCONNECT-NEC 250.24 B 7) PROPERLY SIZE BONDING CONDUCTORS-NEC 250.102 C |
|
| 05/29/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* COMPLETE SERVICE WIRING, BONDING REQUIRED AHEAD OF OVERCURRENT PER 250 NEC |