| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2007 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 03/16/2007 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* PROVIDE AN APPROVED BASE UNDER CONDENSOR DRYER VENT OK REMOVE TRAP FROM COOLING TOWER DRAIN |
|
| 03/15/2007 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/12/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE CLEARANCE FROM COMBUSTIBLE WHERE BOILER VENTS PENETRATE THE ROOF. 2. 100 PSI TEST ON STEAM PIPING OK 100 PSI TEST ON AIR OK 30 PSI TEST ON VACUUM OK 3. PROVIDE THE DRYER VENT AS PER PLANS. 4. COOLING TOWER & RETURN PIPING NOT SIZED PER PLAN, 5. PROVIDE DRAIN FROM TOWER 6. CONDENSATE & STEAM PIPING NOT INSTALLED PER LP1.1/3 TAKE OFF FROM TOP OF PIPE. 7. PROVIDE LETTER FROM ENGINEER IF CHANGING DESIGN. 8. CHECK VALVES NOT INSTALLED AT ALL LOCATIONS PER PLANS. 9. TERMINATE PRESSURE RELIEF VALVES PER PLAN. |