Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM03829
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/09/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
11/03/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1 1/2 COPPER BUILDING INTERIOR BACK TO METER LOCATION OK 1. SHALL SEE RPBA INSTALL. 2. SHALL SEE COMPLETION OF WATER PIPING TO BOILER. 3. A BOILER INSPECTION & PERMIT SHALL BE OBTAINED FOR ALL BOILERS: IF MORE THAN (1) BOILER IS INSTALLED REVISED CITY APPROVED PLAN SHALL BE OBTAINED WITH PIPING DIAGRAMS, FOR WATER EXPANSION TANKS, GAS ETC. |
|
10/27/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - ADD SUPPORT ON HORIZONTAL PIPING IN CEILING AT SERVICE. - 1 1/4" PIPING REQUIRED TO FIRST BRANCH CONNECTION PER REVISED PLAN. - A REDUCER IN A RUN IS A CODE VIOLATION - INSTALL PLASTIC ISOLATOR ON COPPER PIPING AT SHARP METAL PENETRATION. - CLAMP VERTICAL ABS AND GAS LINE W/GALV 2 HOLE STRAPS - AFTER COMPLETING - OK TO COVER LAUNDRY WALL UP TO CHANGE ON COPPER PIPING; TO FIRST TEE. |
|
09/22/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* WATER TEST WASTE & VENT THRU ROOF OK WATER PIPING OK IN WALL ONLY (AIRTEST) SHALL SEE COMPLETION OF WATER PIPING. |