03/09/2007 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
11/03/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1 1/2 COPPER BUILDING INTERIOR BACK TO
METER LOCATION OK

1. SHALL SEE RPBA INSTALL.
2. SHALL SEE COMPLETION OF WATER PIPING TO BOILER.
3. A BOILER INSPECTION & PERMIT SHALL BE OBTAINED FOR ALL BOILERS: IF MORE THAN (1) BOILER IS INSTALLED REVISED CITY APPROVED PLAN SHALL BE OBTAINED WITH PIPING DIAGRAMS, FOR WATER EXPANSION TANKS, GAS ETC.
10/27/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
- ADD SUPPORT ON HORIZONTAL PIPING IN CEILING AT SERVICE.
- 1 1/4" PIPING REQUIRED TO FIRST BRANCH CONNECTION PER REVISED PLAN.
- A REDUCER IN A RUN IS A CODE VIOLATION
- INSTALL PLASTIC ISOLATOR ON COPPER PIPING AT SHARP METAL PENETRATION.
- CLAMP VERTICAL ABS AND GAS LINE W/GALV 2 HOLE STRAPS

- AFTER COMPLETING - OK TO COVER LAUNDRY WALL UP TO CHANGE ON COPPER PIPING; TO FIRST TEE.
09/22/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
WATER TEST WASTE & VENT THRU ROOF OK
WATER PIPING OK IN WALL ONLY (AIRTEST)