Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 07/19/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* RECEIVED LETTERS FROM ARCH. FOR INFO ON BOOTH, HOWEVER, BOOTH STILL REQUIRES EVAL. AS PER LAST INSP. NOTES |
|
| 06/27/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* DENIED PER NEC 2002 110.2, 3 NO LISTING OR LABELING BY CERTIFIED OSHA LABORATORY INFORMATION ON SITE - INSTRUCTIONS FOR THE CROSS FLOW POWER COAT BOOTH STATE ON PAGE 5 THAT THE UNIT IS NOT LABELED BY AN OSHA CERTIFIED TESTING LAB - ONLY COMPONENTS DOES HOWEVER, SAY ETL CERTIFICATION IS AVAILABLE THIS DEPARTMENT IS REQUIRING THIS CERTIFICATION CONTRACTOR IS NOT RESPONSIBLE FOR THIS INSTALLER & PROVIDER ARE THIS IS REQUIRED FOR A FINAL |
|
| 06/21/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* NOTE THAT PLANS DO NOT SPECIFY OTHER THAN "SPRAY BOOTH" FOR POWDER COTE BOOTH - THIS APPLICATION FALLS UNDER ART.516 OF THE NEC CONTR. SAYS THERE WILL BE NO FLAMMABLE LIQUIDS OR POWDER TO BE APPLIED IN BOOTH. PLEASE HAVE ARCH. OF RECORD TO CLASSIFY "SPRAY BOOTH" OR NOT AS INSTALLED BOOTH DOES NOT MEET THE REQUIREMENTS OF ART. 516 NEC |