Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T06CM03151
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2007 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
04/17/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L B.50-2.4 TOP OUT ELEVATOR SHAFT |
|
04/16/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L B.50-5 13'3"-12'5" TOPOUT SOUTH WALL 17'7" ELEVATOR BEAM POCKET OK |
|
04/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' ELEVATOR SHAFT; TOP OUT CMU WALL GL B.2-2.4 |
|
04/11/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L B.5 - LINE 27 UP TO LEDGER HEIGHT |
|
04/10/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS G.L B.2/8' NORTH OF 1.1-2.8 10' TO TOPOUT G.L B.2/2.8 TO 25' SOUTH OF 52 10' TO 14' 30' SOUTH OF A.3/0' TO 28' WEST OF A.3 10' TO 14' |
|
04/09/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) GL B.50 2ND LIFT 2ND FLOOR, 2ND LIFT ELEVATOR SHAFT 2ND FLOOR |
|
04/06/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) CMU WALL G.L. B.2/11' NORTH OF 1.1, 20'S OF S.2 25'-6" W OF G.L. A/3 TO 30'-8" 5 OF A/3 0' TO 8' ABOVE 2ND FLOOR |
|
04/04/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS 30' S/10' - 28' WEST OF G.L A.0/2.0 14'-18 GL B.05/0.0-2.7 B.1-B.2/2.6 |
|
03/28/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* G.L B.2 14'-19 A.F.F.E G.L H.0-10' E/2.8-4.8 18'-23 A.F.F.E |
|
03/23/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 28' LIFT ON STAIRWELL EAST END |
|
03/15/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2 COLUMNS G.L A/3 11'6" - 14' A.F.F.E |
|
03/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL G.L B.05/0.0-2.5 9'8" - 13'8" A.F.F.E |
|
03/12/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS GL B.1-B.2/0.0-2.7 12'-13 - 8" A.F.F.E 17'6" N OF GL B.1-E.1/00 0'-4" A.F.F.E PILASTER GL A.0/3.0 8'-11'8" A.F.F.E 30' 5 OF GL A.0/3.0, 30' 5/28' W GL A.0/3.0 |
|
03/09/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' LIFT EAST WALL ON ROOMS 105, 106, 109, 115, 119 |
|
03/08/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALL G.L B.1-B.2/0.2-2.5 8'-12' A.F.F.E 0-10'8" NORTH OF GL C.O/1.1 |
|
03/07/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 8' LIFT CMU WALL EAST OF ROOM 119, 115, 109, 106 & 105 |
|
03/06/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1, 1 COLUMN 8' - TOPOUT A.O/3.0.2; CMU ELEVATOR P.T WALLS 4'-8' 3, CMU WALL GL C/1.2 10'8" N OF 1.2, 4'-8' A.F.F.E 4, CMU WALL LOCATED 3-1 EAST OF GL E/5-9 8" N OF G.L |
|
03/05/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3 COLUMN TOPOUT 4'-8' A.F.F.E B.2/0.0-3.0 |
|
03/02/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 3 NORTHWEST COLUMN 13'8" 4' LIFT WEST WALL AT LOBBY 14' WEST STAIRWELL WALL 17' EAST WALL AT STAIRWELL |
|
02/28/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 12' LIFT LINE G -1.1 - 2.5, STAIRWAY WALL 12' EAST END |
|
02/26/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* ELEVATOR SHAFT 8' LIFT, 4' LIFT B.2-K-O, LINE L-N-P LINE E-N-P |
|
02/22/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 2ND LIFT WALL RM 138 & 150 COLUMN PIER G LINE STAIRWAY #3 8' L.F |
|
02/20/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* SOUTHWEST COLUMNS 3 @ 12' OK TO GROUT |
|
02/16/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 9 MASONRY COLUMNS AT WEST END OF BUILDING 8' LIFT |
|
02/13/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* MASONRY PIERS 25' W/0 - 117'S OF G.L.A/0 7 TOTAL 0'-4' A TO F 0-30'S OP G.L A/3 2 TOTAL 0'-4' A TO F CMU WALLS G.L 3.1-4.8/H - 0'-9'-4" E OF G.L H/4.8 9'4" OF G.L H/3.1-4.8 |
|
02/01/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* 1) LINE G 4' LIFT 2) ELEVATION SHAFT 4' LIFT |
|
01/25/2007 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* CMU WALLS GL H.0 H.5/2.9 GL C.0-H0/5.0-5.3 - 8" GL C.7.0/.05 - 2.7 O 1.4" GL B7/4.0-5.2 |