Permit: T06CM03151

Parcel: 11202003D

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
10/01/2007 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
04/17/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L B.50-2.4 TOP OUT ELEVATOR SHAFT
04/16/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L B.50-5

13'3"-12'5" TOPOUT SOUTH WALL 17'7"
ELEVATOR BEAM POCKET OK
04/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12' ELEVATOR SHAFT; TOP OUT CMU WALL GL B.2-2.4
04/11/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L B.5 - LINE 27
UP TO LEDGER HEIGHT
04/10/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS G.L B.2/8' NORTH OF 1.1-2.8 10' TO TOPOUT
G.L B.2/2.8 TO 25' SOUTH OF 52 10' TO 14'
30' SOUTH OF A.3/0' TO 28' WEST OF A.3 10' TO 14'
04/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) GL B.50 2ND LIFT 2ND FLOOR, 2ND LIFT ELEVATOR SHAFT 2ND FLOOR
04/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) CMU WALL G.L. B.2/11' NORTH OF 1.1, 20'S OF S.2 25'-6" W OF G.L. A/3 TO 30'-8" 5 OF A/3 0' TO 8' ABOVE 2ND FLOOR
04/04/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS 30' S/10' - 28' WEST OF G.L A.0/2.0 14'-18

GL B.05/0.0-2.7
B.1-B.2/2.6
03/28/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L B.2 14'-19 A.F.F.E
G.L H.0-10' E/2.8-4.8 18'-23 A.F.F.E
03/23/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
28' LIFT ON STAIRWELL EAST END
03/15/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2 COLUMNS G.L A/3 11'6" - 14' A.F.F.E
03/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALL G.L B.05/0.0-2.5
9'8" - 13'8" A.F.F.E
03/12/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS GL B.1-B.2/0.0-2.7
12'-13 - 8" A.F.F.E
17'6" N OF GL B.1-E.1/00 0'-4" A.F.F.E
PILASTER GL A.0/3.0 8'-11'8" A.F.F.E
30' 5 OF GL A.0/3.0, 30' 5/28' W GL A.0/3.0
03/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12' LIFT EAST WALL ON ROOMS 105, 106, 109, 115, 119
03/08/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALL G.L B.1-B.2/0.2-2.5 8'-12' A.F.F.E
0-10'8" NORTH OF GL C.O/1.1
03/07/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
8' LIFT CMU WALL
EAST OF ROOM 119, 115, 109, 106 & 105
03/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1, 1 COLUMN 8' - TOPOUT A.O/3.0.2; CMU ELEVATOR P.T WALLS 4'-8'

3, CMU WALL GL C/1.2 10'8" N OF 1.2, 4'-8' A.F.F.E

4, CMU WALL LOCATED 3-1 EAST OF GL E/5-9 8" N OF G.L
03/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3 COLUMN TOPOUT 4'-8' A.F.F.E B.2/0.0-3.0
03/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3 NORTHWEST COLUMN 13'8"
4' LIFT WEST WALL AT LOBBY
14' WEST STAIRWELL WALL 17' EAST WALL AT STAIRWELL
02/28/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12' LIFT LINE G -1.1 - 2.5, STAIRWAY WALL 12' EAST END
02/26/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ELEVATOR SHAFT 8' LIFT, 4' LIFT B.2-K-O, LINE L-N-P
LINE E-N-P
02/22/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
2ND LIFT WALL RM 138 & 150
COLUMN PIER G LINE STAIRWAY #3 8' L.F
02/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SOUTHWEST COLUMNS 3 @ 12' OK TO GROUT
02/16/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
9 MASONRY COLUMNS AT WEST END OF BUILDING 8' LIFT
02/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
MASONRY PIERS 25' W/0 - 117'S OF G.L.A/0
7 TOTAL 0'-4' A TO F
0-30'S OP G.L A/3 2 TOTAL 0'-4' A TO F
CMU WALLS G.L 3.1-4.8/H - 0'-9'-4" E OF G.L H/4.8
9'4" OF G.L H/3.1-4.8
02/01/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) LINE G 4' LIFT
2) ELEVATION SHAFT 4' LIFT
01/25/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
CMU WALLS GL H.0 H.5/2.9
GL C.0-H0/5.0-5.3 - 8"
GL C.7.0/.05 - 2.7 O 1.4" GL B7/4.0-5.2