Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | THE MAJORITY OF SOIL IN THE PARKING AREA HAS BEEN CLEANED UP. EXCESS MATERIAL FROM MIXING OF MORTAR HAS BEEN REMOVED. CONTINUE TO SWEEP PARKING AREA ROUTINELY. PROVIDE CONTAINMENT FOR MORTAR MIXING OPERATIONS. ROUTINE INSPECTIONS WILL BE PERFORMED TO ENSURE COMPLIANCE. |
|
| 09/18/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE GIVEN, SECOND VISIT. 1) CLEAN UP SOIL, CONSTRUCTION DEBRIS AND MATERIALS AND/OR PLACE SEDIMENT CONTROLS AROUND PILES OF DIRT. 2) ALL EXCESS MATERIAL FROM MIXING OF MORTAR MUST BE CONTAINED AND NOT ALLOWED TO MIGRATE OFF SITE. 3) PARKING AREA MUST BE SWEPT ON A ROUTINE BASIS. |
|
| 09/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CONTRACTOR IS DISCHARGING OFF SITE. NO SEDIMENT CONTROLS IN PLACE, SOIL AND BLDG MATERIALS ALL OVER SITE AND SURROUNDING AREA. ASKED CONTRACTOR ON SITE TO CLEAN UP SOIL AND BRING IT BACK ONTO HIS SITE OR PLACE SEDIMENT CONTROLS AROUND THE PERIMETER. PICS TAKEN AND WILL BE SAVED UNDER THE BLDG PERMIT # RE-SHEDULE INSPECTION. |