Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2007 | ENGINEERING - FINAL | Approved | ||
| 05/07/2007 | ENGINEERING - FINAL | Denied | 1) REMOVE SOIL AND CONSTRUCTION DEBRIS FROM PARKING AREA. 2) PATCH ASPHALT IN PARKING AREA (ESP. AT HC RAMP). 3) HC RAMPS ADDED AS PART OF THIS PROJECT REQUIRE TRUNCATED DOMES AT ALL VEHICULAR TRAFFIC TRANSITION POINTS. 4) COMPLETE LANDSCAPING. 5) INSTALL BICYCLE PARKING PER APPROVED PLAN. 6) INSTALL CONCRETE WALKS/PATIOS PER PLAN, SEE NOTE #12. |
|
| 09/11/2006 | ENGINEERING - FINAL | Not ready for Inspection | SEE STORM WATER FOLLOW UP INSPECTION |