Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/23/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST UNDERGROUND THRU BUILDING + 2 WAY CLEANOUT OT 5' EXTERIOR OF BUILDING OK 1. NEED TO SEE CONNECTION TO SITE SEWER. |
|
| 08/22/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. SHALL HAVE TEST IN PLACE AT TIME OF INSPECTION. 2. SHALL PROVIDE LONG RADIUS FITTINGS FOR VENTS BELOW FLOOD RIM OF FIXTURE FOR FLOOR DRAINS. 3. SHALL EXPOSE ALL FITTINGS AND REMOVE ALL WET SOIL FOR WATER TEST. |
|
| 07/20/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/18/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 03040 - 2 1/2 FROM 4" DOWNSTREAM OF RPB'S AT EXISTING BUILDING TO ROAD OK, REPAIR LEAK OTHER SIDE OF ROAD TO STUB UP 5' FROM NEW BUILDING WATER TEST. SEE NOTES FROM 7/13/06 |
|
| 07/13/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |