Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2007 | ENGINEERING - FINAL | Approved | *RIP RAP OUTFALLS MISSING AT BASIN OUTLET AND AT END OF CONCRETE SWALE (NW CORNER) *MISSING CONCRETE SWALE FROM SE CORNER OF BUILDING TO EAST *NO CONCRETE SWALE THROUGH GRAVLE AREA ON EAST SIDE OF BUILDING *RIP RAP BANK STABILIZATION NOT INSTALLED NE SIDE OF SITE *TRASH ENCLOSURE AREA NOT BUILT *INLET SWALE NOT BUILT INTO BASIN FROM BUILDING CP-REMOVE ALL STORMWATER CONTROLS *SEE 7/9 ENTRY T06BU01077 AND T06BU01610 |
|
| 06/07/2007 | ENGINEERING - FINAL | Not ready for Inspection | OUTSTANDING GRADING ISSUES -RIP RAP OUTFALLS MISSING AT BASIN OUTLET AND AT END OF CONCRETE SWALE (NW CORNER) -MISSING CONCRETE SWALE FROM SE CORNER OF BUILDING TO EAST -NO CONCRETE SWALE THROUGH GRAVLE AREA ON EAST SIDE OF BUILDING -RIP RAP BANK STABILIZATION NOT INSTALLED NE SIDE OF SITE -TRASH ENCLOSURE AREA NOT BUILT -INLET SWALE NOT BUILT INTO BASIN FROM BUILDING -REMOVE ALL STORMWATER CONTROLS |
|
| 06/06/2007 | ENGINEERING - FINAL | Partial Approval | MET ONSITE WITH ALAN LEVIN NEEDS FINAL GRADING SCHEDULED FOR 6/7 |
|
| 05/01/2007 | ENGINEERING - FINAL | Partial Approval | T06BU01077 AND T06BU01610 OUTSTANDING GRADING PERMITS MOST SITE COMPLETE ALL PERMANENT SURFACES INSTALLED FINAL STABILIZATION STILL OUTSTANDING NO CONCERNS FOR TEMP C OF O |