Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/25/2006 | FRAMING | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |
|
| 09/15/2006 | FRAMING | Partial Approval | IVRS - Inspection :* 1. SEVERAL 4A WALLS ARE MISSING BRACING TO ABOVE STRUCTURE AS PER DETAIL 2/A6 2. TOILET #1 WASTE DRAIN @ 10" FROM WALL -- NEEDS TO BE MOVED TO 18" FROM WALL. 3. INTERIOR COLUMN FOOTING PITS -- PLEASE DRAIN WATER FROM ALL PITS -- MOSQUITO PROBLEM 4. OK TO SHEETROCK PROGRESS AREAS THAT ARE NOT MISSING BALCONY (ONE SIDE) |