Permit: T06CM01065

Parcel: 115170980

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
05/19/2008 PLUMBING - FINAL Approved IVRS - Inspection :*
1. CONTRACTOR TO INSTALL CLEANOUTS AT
KITCHEN SINKS (2)
2. CONTRACTOR TO INSTALL HAMMER ARRESTORS AT WASHER BOX
3. PLUMBING FINAL OK
05/16/2008 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
NO PCDEQ AUTHORIZATION TO DISCHARGE = REINSPECTION FEE
05/07/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
NEED PCDEQ AUTHORIZATION TO DISCHARGE ON SITE
BEFORE I CAN DO A FINAL INSPECTION
04/29/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1. CALL IN AND HAVE APPROVED ALL REQUIRED INSPECTIONS PRIOR TO CALLING FINAL
2. HAVE SEWER AS BUILTS "REDLINES" AND VERIFICATION OF GRADE BY THE ENGINEER
04/17/2008 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*