Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) PLUMBING FINAL OK 2) OK FOR C OF O S.T.O.I. |
|
| 08/17/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* GATE LOCKED 3 PM |
|
| 08/16/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NEED BACKFLOW CERTS FOR ALL INTERNAL ASSEMBLIES RP NEEDS DRAIN ALL PUBLIC LAVATORIES OK TO COVER |
|
| 07/25/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - WATER IS TO BE ON AT ALL FIXTURES - PROVIDE CLEAN BACTERIA REPORT - BACKFLOW CERTIFICATION - INSULATE ALL HOT PIPING - CONTINUED "NOT READYS" WILL RESULT IN A REINSPECTION FEE |
|
| 07/05/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* YOU HAVE BEEN INSTRUCTED TO CALL IN AND HAVE APPROVED, ALL REQUIRED INSPECTIONS PRIOR TO CALLING IN FINAL, AFTER, ALL REQUIRED INSPECTIONS HAVE BEEN APPROVED, THEN YOU WILL BE READY TO CALL IN FINAL |
|
| 05/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* CONTRACTOR CANCELLED |