Permit: T06CM00831

Parcel: 10706023G

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
05/01/2007 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
12/14/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
10/26/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
SAND/OIL SEPARATOR PIPING TO TIE IN TEST OK
TIE IN NO MARKED TEST UP TO
10/19/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
N/H RAIN LEADER TIED INTO PREVIOUSLY INSPECTED UNDERGROUND.
10/15/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. 8" N/H RAIN LEADER STUBBED OUT OF BLDG.
2. BLDG. DRAIN ON SOUTH SIDE OF BLDG. OK TO COVER.
08/28/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
08/15/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. PIPE DAMAGED BY LABORERS REPAIRED OK --
OK FOR CONCRETE.
2. HOT INSULATED OK FROM BATHROOM IN GROUP TO W.H
08/10/2006 PLUMBING - ROUGH, SOIL Partial Approval 1. UPPER 6" CLEANOUT AT S.W CORNER OF BLDG. WITH 4" BRANCH STUBBED ABOUT FOUR FEET.
2. 6" CONNECTION INSIDE BLDG. LINE TO PREVIOUSLY INSPECTED SECTION -- OK TO COVER
3. PIPING DAMAGED BY LABORERS TO BE REPAIRED AND RETESTED AND INSPECTED.
08/07/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
08/04/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PIPE WRAPS OK IN JUVENILE HOLDING AREA FOOTINGS,
ENSURE THAT TRAP ARMS HAVE PROPER GRADE DURING POUR.
FDS NOT YET INSTALLED WHEN PIPES ARE REPAIRED, RETEST
OK FOR CONCRETE
120 PSI TEST, TYPE L COPPER
WATER PIPING OVERHEAD ALONG COL. B-1 WITH STUB OUTS
TO SOUTH ADDITION AND NORTH RUNS ALONOG COLS 4 AND 5.2 FEEDING TOILET RMS 407, 407 AND WH RM 410, RM 404 ALSO SINKS AND WH AT RMS 315, 314.
COPPER TOUCHING METAL AT WH AND RM 401
PROVIDE SPECS ALLOWING PULLED TEES. OK TO INSULATE HOT. TEST ON DWV ONLY TO 6'.
PROVIDE 10' HEAD TEST ON ALL WASTE PIPING.
TEST ALL VENTS TO ROOF.
08/01/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
PIPE WRAPS IN ADULT HOLDING AREA OK
07/13/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. N/H WASTE PIPING TO INTERCEPTOR (NOT SET) INCLUDING VENT TRACK EXTERIOR WALL OK
07/05/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
OKAY TO POUR NEXT SECTION 07/03/06
06/29/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
06/02/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
OK TO POUR WHAT IS READY
CONTRACTOR WILL RECALL NEXT SECTION.
06/01/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. 6" ABS BLDG. DRAIN MAIN TO OUTSIDE JUST PAST TWO WAY CLEAN-OUT OK TO COVER.
05/22/2006 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1. DWV UNDERGROUND AS HIGHLIGHTED ON PLAN AND VERIFIED BY J.C. OK TO COVER.
WATER TEST ONE RISER TO TEN FEET.
AS NOTED ON P1.1 & P1.0