Permit: T06CM00831

Parcel: 10706023G

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
02/27/2008 ELECTRIC - FINAL Approved ALL REQUIRED SPECIAL INSPECTION REPORTS FOR ELECTRICAL SYSTEM REVIEWED AND ACCEPTED
09/06/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
LIGHTNING PROTECTION SYSTEM TO BE INSPECTED AND APPROVED BY THIRD PARTY NRTL

ALL ELSE OK FOR FINAL
08/30/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1. TRANSFORMER "T1" TO BE MOVED
2. LIGHTNING PROTECTION SYSTEM TO HAVE THIRD PARTY INSPECTION
08/24/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CORRECTIONS IN PROGRESS
08/22/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
INSPECTION FOR EMERGENCY LIGHTING DONE 8/21/07
ALL OK EXCEPT EMERGENCY LIGHTING IN BOTH WEST SIDE BATHROOMS (NOT WORKING)

CORRECTIONS IN PROGRESS
08/16/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1. PROVIDE A SIGN AT S.E.S MEETING THE REQUIREMENTS OF NEC 702.8 FOR U.P.S SYSTEM
08/14/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSPECTION FOR CEILING AREA ABOVE
HOLDING CELLS & ROOM 206

1. NEED A SERVICE RECEPTACLE - NEC 210.63
2. LOW VOLTAGE WIRING TO BE RAN IN A NEAT AND WORKMANLIKE MANNER AND PROTECTED FROM PHYSICAL DAMAGE - NEC 800.6
3. FINISH WIRING, CLOSE J-BOXES
08/13/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
08/10/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1) INSTALL BOX EXTENDERS IN ARMORY-NEC 314.20
2) MAX LENGTH DISPOSAL CORD 36" NEC 422.16 AND USE CONNECTOR NEXT INSPECTION
3) COM. ROOM, UPS EMERGENCY LIGHT TEST
08/07/2007 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
INSPECTION FOR GENERAL OFFICE AND HALL AREAS
NORTH TO LOCKERS
08/03/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
INSPECTION FOR CHILLER ROOM & AIR HANDLER
ROOM #701-703

1. PLAN SHOWS FEEDER PULLED TO FUTURE CHILLER #2
08/02/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
WORK IN PROGRESS
WE WILL INSPECT #703, 702, 701
NEXT INSPECTION
07/27/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
WORK IN PROGRESS
07/25/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
WORK IN PROGRESS
*NOTE: A SECOND ENTRANCE TO SES ROOM
TO BE PROVIDED TO COMPLY WITH NEC 110.26 C2
07/23/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSPECTION FOR FLEET SERVICE AREA
1. REPLACE WATER BOND CLAMP
2. PROVIDE GFI PROTECTION FOR RECEPTACLES
PER NEC 511.12
3. REMOVE TEMP WIRING
4. CLOSE UP J-BOXES
5. WILL NEED ENGINEERS SEAL FOR LIGHTING PROTECTION PLAN FOR INSPECTION OR YOU CAN HAVE A THIRD PARTY (NRTL) INSPECTION
07/19/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSPECTION FOR GENERATOR ROOM
1. BONDING JUMPER FOR GENERATOR TO REMAIN REMOVED
2. EMERGENCY LIGHTING TO BE PER PLAN (LOCATION)
3. HAVE OPEN WIRING/ENCLOSURES
4. INSTALL SINGLE RECEPTACLE FOR GENERATOR HEAT/CHARGER NOT GFI RECEPTACLE
5. PROVIDE FAULT CURRENT INFORMATION FOR GENERATOR AND ASSOCIATED EQUIPMENT. ALSO, MISSING EQUIPMENT ON SINGLE LINE DIAGRAM
6. GENERATOR EXH. DAMPER NOT OPERATIONAL
7. PLANS SHOW SMOKE DETECTOR IN THIS ROOM
07/18/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSPECTION FOR SES ROOM
1. INSTALL PANIC HARDWARE FOR DOORS -- NEC 110.26 C2
2. FINISH ALL DEMO/REMOVE TEMP WIRING AND EQUIPMENT
3. SECURE BONDING CONDUCTOR TO STRUCTURE
4. DRAIN PIPE TO BE REMOVED ABOVE SERVICE - NEC 110.26F
5. FIRE ALARM, EX. FAN NOT COMPLETE
6. RECEPTACLES WITH METAL FACEPLATES TO EXTEND PAST FACE PLATE -- NEC 406.4D
7. FLEX TO TRANSFORMER NOT TO BE IN FRONT OF
PANEL "EM" -- NEC 110.26
8. ADD SECOND PERSONNEL DOOR FOR EGRESS WITH PANIC BAR PER NEC 110.26 C 2
07/17/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
INSPECTION FOR MAIN BUILDING ROOFTOP
1. LIGHTING PROTECTION SYSTEM NOT PER PLAN
PROVIDE REVISED PLAN IF ONE EXISTS. ALSO, NEED TO MAKE CONNECTIONS AS OUTLINED BY PLAN.
2. NEED TO IDENTIFY AC 1 DATA PLATE
3. COMPLETE MAST WIRING/BONDING

NOTE: GROUNDING ELECTRODE SYSTEM FOR LIGHTNING PROTECTION WILL NEED TO BE EXPOSED FOR INSPECTION
ALSO, PROVIDE REVISED/APPROVED PLAN FOR THIS SYSTEM.
07/12/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
07/05/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
OK INTERIOR WIRING PANELS MI, ACI, AC2
1. DRAIN ABOVE THESE PANELS TO BE RE-DIRECTED TO AN AREA AWAY FROM PANELS.