Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/26/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE CORRECT INSTALLATION OF INDIRECT DRAINS AND SUPPORT/SECURE 2. PROVIDE 3/4 WATER SUPPLY PIPING TO P-14 PER PLAN 3. INSTALL RPS FOR 603 4. UNIONS REQUIRED AND ACCESS TO ASSEMBLIES 5. 5' ABV FLOOR MAX. 6. PROVIDE 2" INDIRECT WASTE PIPING PER PLAN AT P-14 7. DOME STRAINER AND 3/4 GRATE CONTINUED DENIED INSPECTIONS WILL RESULT IN REINSPECTION FEES |
|
| 08/07/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) BACTERIA REPORT RECEIVED-PROVIDE SHELL APPROVAL 2) PROVIDE LISTING FOR STERILIZER EQUIPMENT WATER CONN. BACKFLOW PROTECTION MAY BE REQUIRED 3) PROVIDE BACKFLOW CERTS ON ALL INTERNAL ASSEMS. CAULK UPSTAIRS TOILET 4) CORRECT PVC DRAIN AT BEV DISP. PRIMER AND CLAMP ON DOWN STAIRS TOILET ROOMS OK |
|
| 07/18/2008 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SHELL DOES NOT HAVE FINAL APP. PROVIDE THE REST OF THE PLANS; SPECS, PAPERWORK 1. COMPLY WITH THE UPC CODE REQUIREMENTS 609.9 FOR STERILIZATION 2. THIS BUILDING HAS BEEN SITTING FOR 3YRS 3. REFER TO CHAPTER 6 FOR PROPER RP ASSEMBLY INSTALLATION. 4. ALL INDIRECT DRAINS SHALL BE INSTALLED 5. SECURE PIPING AT BEV. LIST NOT COMPLETE BECAUSE PLANS AND WORK ARE NOT COMPLETE |
|
| 06/20/2008 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled | |
| 04/15/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* FLUSH-O-METER CRITICAL LEVEL DRIPS ON LAV DRAINS ALL FIXTURES AND EQUIPMENT INCLUDING BEV. AND OTHER SHALL BE INSTALLED AND BACKFLOW PROTECTION MAY BE REQUIRED AT WH FOLLOW PLAN DETAIL ALSO, PROVIDE CLEARANCE FOR SOV HANDLE EXPOSE ALL CLEANOUTS WASHER BOXES AND ICE MAKER REQUIRE WATER HAMMER ARRESTORS LIST NOT COMPLETE |